    Development Ethics for Alto

    Brief to the Alto online public consultation

    JD
    Jay Drydyk
    Professor Emeritus, Carleton University
    Past President, International Development Ethics Association
    Publisher’s Note

    The ALTO HSR Citizen Research Initiative is pleased to publish this guest brief with the author’s permission. It is reproduced as written; the analysis, rankings, and recommendations are Dr. Drydyk’s own. Footnotes appear as endnotes at the foot of the page.

    Section 1

    The contractor and the public

    Suppose our roof is damaged, and we are restricted by our bank to dealing with only one contractor for the repair. The contractor tells us there are two options, A and B, both of which are risky and expensive. Then we find out there is a third option, which is not so risky or expensive. The contractor has not only concealed this from us but now refuses to talk about it.

    Is this an ethically acceptable way of doing business? No, it seems to violate basic values of honesty and transparency.

    By analogy, this seems to be how Alto has tried to do business with us as a public. The roof is our broken inter-city transportation system. The two expensive and risky options are two new high-speed rail [HSR] corridors put forward in the Alto project proposal of 2025-26. What I will call the ‘northern Shield corridor’ lies north of Highway 7, and what I will call the ‘Frontenac/Napanee corridor’ lies south of Highway 7. Farther south another corridor already exists, along the CN right of way and Highway 401. This third, most southerly corridor is the one that Alto is reluctant to discuss.1

    To put this in another way, the imaginary contractor and the real agents of Alto are both selling their solutions with logical fallacies. The contractor tells us: you need to fix your roof, so you need my options A or B. Alto: you need to fix your broken transportation system, so you need a new transportation corridor. Neither argument follows, because in each case there is a third option.

    Section 2

    Good development vs. maldevelopment

    Some development is worthwhile, but some is quite undesirable; this is an ethical difference, based on values, and with 80 years of post-WWII experience we know a lot about what these values are. Worthwhile development not only produces more, it also enhances people’s well-being and freedom, so that they are better able to shape their own lives for the better; it also does so equitably and sustainably. These are the pillars of what has been identified as a worthwhile ‘human development’ approach by the influential economist Mahbub ul Haq in collaboration with Nobel laureate Amartya Sen.2

    Meanwhile, other development researchers have studied what these broad values require in practice in cases of development projects (like Alto) that involve land-taking.3 Some guidance can be found in national legal systems, in international human rights law, and in operational policies of international financial institutions. Yet the evidence shows that ‘even when all three approaches are applied consistently, outcomes … are generally still poor’, impacting negatively on the livelihoods and well-being of people affected.4 A recent synthesis of this research has formulated six guiding principles to fill these gaps. Three of these are most significant for the Alto proposal:

    2. Fair procedures: promote inclusive decision-making through a fair and transparent procedure from the outset and throughout the lifecycle of the project;

    3. Fair distribution: ensure a fair distribution of impacts and benefits and align with the Sustainable Development Goals;

    6. Remedy and accountability: ensure remedy and accountability through access to grievance redress mechanisms, remediation and legal recourse.5

    These values and principles help to distinguish between good development and maldevelopment in five dimensions of the Alto proposal: public interest, landowner impact, community impact, environmental impact, and Indigenous peoples’ consent.

    Section 3

    Public interest, public need

    Development ethics tells us that people should not be displaced and land should not be taken for development except for projects that are in the public interest.6 What does ‘public interest’ mean here? It means that the gains or advantages created by the project are not entirely private gains, that very significant gains accrue to us as a public. An important standard of public interest is public need. Building schools and hospitals involves land-taking, by which some residents may be displaced, and yet there is great gain to the public, in having schools and hospitals, simply because schools and hospitals are things we need, as a public. This does not entail that building a particular school in a particular place is the best way to meet this need, but it does give very strong reason for building some such school where it is most needed.

    The term ‘high-speed rail’ has been used with different meanings in recent discussions, and so I want to be clear that what I will mean is rail service with maximum speeds faster than 200km/hr. This range corresponds with the definition of HSR by the International Union of Railways.7 This range includes what Alto means by ‘high-speed’, which is faster than 300km/hr, but it also includes speeds in the 200 range. Unlike the Alto definition (>300km/hr), the broader UIC definition captures the majority of high-speed rail services currently offered in Japan and Europe.8

    There is a strong case that high-speed rail, in this sense, is a public need in Ontario and Québec. According to this argument, HSR is needed to shift people’s choices in the Ontario-Québec corridor from airplanes, cars, and buses to trains. This is needed for two main reasons. First, continued reliance on cars, buses, and airplanes, for generations to come, has an unacceptable carbon footprint, which will contribute to ever greater loss of life, property, homes, and habitats through climate change. Second, continued reliance on cars, buses, and airplanes imposes a drag on economic productivity, putting downward pressure on livelihoods and well-being throughout the economy. For these two reasons, it is argued, we have a long-term need to change the mode of inter-city transport in this corridor, and, to achieve this we have a long-term public need for high-speed rail.9

    However, this does not determine where and how HSR should be built – with one exception. Building HSR stations at locations removed from city centres defeats the purpose of HSR (for travelers) by adding commuting time to reach the stations.10 As to where and how HSR is built, public benefit is only one value that matters: we also have equity/fairness/justice and sustainability to consider. There are equity issues pertaining to landowners, communities, and Indigenous peoples, which I will consider in the next three sections; environmental values will be considered in section 7. All of these raise further issues of accountability.

    Section 4

    Landowner impact

    When we notice unfairness or injustice, we are perceiving some kind of deprivation as being wrong. Even if a development project meets public needs and creates public benefits, our intuitive sense of justice will object if the project imposes unwarranted burdens and harms on others. It remains true for cooking that, ‘If you want make an omelet you have to break some eggs,’ – but not as a metaphor excusing harmful development. Thus it is widely accepted that development projects should not make people worse off, either by displacing them from their land, or through other community impacts.11

    Paying people market value for the land that is taken from them may still leave them worse off. One reason is the impact of land-taking on livelihoods. When his land was assessed for compensation by an oil pipeline project, a Ugandan farmer remarked, ‘I had 10 mango trees where I used to make a lot of money every season and look after 11 dependents, we got only 670,000 [shillings] … they didn’t think about the capital value required to plant new trees and how many years it would take us to start harvesting fruits again.’12 The Alto project does not threaten any mango trees in Eastern Ontario, but it does threaten to impact livelihoods by dividing farms. It may be possible to mitigate these effects, but it would be complicated: organizing and paying for land swaps so that each farm is made whole by other land on the same side of the fenced-off right of way. One challenge of land replacement strategies like these is to ensure that the replacement land is of as good quality as the land lost. If this is not possible, compensation for lost revenue/livelihood would require revenue sharing plans on the part of the project.

    The Ontario Federation of Agriculture has stated:

    It is not acceptable for any railway to divide properties and thereby “landlock” the interior of the lot. Any crossing must be at least 10 metres wide to allow large and irregularly shaped farm and forestry equipment to be conveyed safely across the railway. Over- and underpasses must be engineered to accommodate the weight, height, and width of not only today’s farm and forestry equipment but also what machines may be used in the future. Crossings must also be engineered to prevent equipment rollovers. Alto must also preserve drainage system functionality and not adversely affect natural drainage systems.

    Alto has stated that the entirety of the railway corridor will be fenced. Alto must consult on the fencing design to ensure farm animals cannot stray onto the tracks, as some farm animals have special fencing needs.

    In addition, Transport Canada and Alto must provide fair and proportionate compensation for other negative affections caused by the railway, which will permanently affect farm production and limit growth potential.13

    The issue here is equity: if these effects are not fully mitigated and/or compensated, the farmers will bear special burdens for the building of high-speed rail – as if an arbitrary high-speed rail tax were imposed upon farmers on whose land track was laid.

    Currently no accountability mechanisms have been established to ensure that such mitigations and compensations are carried out, and to which landowners can seek recourse in case mitigation and compensation are not carried out. Government has an ethical obligation to establish such mechanisms before making a final investment decision.

    Section 5

    Community impacts

    According to Alto:

    However, this same railway separation also has other consequences for human security. Limited overpass/underpass crossings may increase distances and times for fire and ambulance services, potentially causing fatal delays.15 These security gaps can be mitigated by careful planning of overpasses and underpasses; mitigation plans should be agreed with the municipalities responsible for delivering these services. Best practices of high-speed rail systems in other countries should be followed.

    Once again accountability is a problem. To date no accountability mechanisms have been established to ensure agreement and planning for timely fire and emergency health services after Alto rail lines have been built and separated from roadways. Nor is there any body to which municipalities can seek recourse in case such agreement and planning do not occur, or in case agreements are not fulfilled. Government has an ethical obligation to establish such mechanisms before making a final investment decision.

    If the Frontenac/Napanee or northern shield corridors are chosen for HSR, existing VIA service will be impacted by service cuts as longer-distance travellers shift to HSR. At present Kingston is the fifth-busiest passenger train station in the country. There is a public need to maintain viable service for these passengers and others from stations along the existing VIA corridor. Moreover, community impacts from Alto would reach far beyond eastern Ontario. If 80% of VIA revenue currently comes from passengers travelling in the Windsor-Québec corridor, and much of this is diverted to Cadence as operator of HSR between Toronto and Québec, much less will be available to support other major VIA trains, such as: Montréal-Halifax (‘The Ocean’); Toronto-Vancouver (‘The Canadian’); Winnipeg-Churchill; Jasper-Prince Rupert; Sudbury-White River; Montréal-Jonquière/Senneterre. Allowing these train services to be degraded or discontinued would constitute a clear neglect of public interest. Accordingly, the Alto HSR Citizens Research Initiative has called for two immediate legislative responses:

    Statutory Service Guarantee for the Kingston SubdivisionAny federal legislation enabling ALTO must include a statutory charter guaranteeing minimum VIA Rail service levels on the Kingston Subdivision. The charter must specify minimum daily frequencies, protect morning and evening service windows, and require public consultation before schedule changes affecting intermediate communities.

    Dedicated, Legislated Funding for the National Rail NetworkParliament must establish a dedicated funding stream for VIA Rail’s non-corridor network — The Ocean, The Canadian, and remote services — entirely independent of corridor revenue that will transfer to Cadence. This fund must be protected as a condition of any ALTO implementation agreement.16

    The appropriate timing for such legislative action would be as close as possible to the final investment decision on the Alto project.

    Section 6

    Indigenous peoples’ consent

    Alto has stated, ‘We are committed to engaging in meaningful consultations with the aim of securing the Free, Prior, and Informed Consent (FPIC), of potentially impacted communities.’17 The phrasing is ambiguous. Are they committed to achieving FPIC, or only to holding ‘meaningful consultations with the aim’ of doing so? The UN Declaration on the Rights of Indigenous Peoples is unambiguous on this point.

    Meaningful consultation is not the end; it is only a means to achieving ‘free and informed consent prior to the approval of any project affecting their lands or territories and other resources’.

    The earlier High Frequency Rail project which preceded Alto included consultation with ‘more than 40 potentially impacted Indigenous communities and organizations’.19 However, that consultation focused entirely on supplementing the Request for Proposals with provisions for Indigenous social benefits and participation. There was no mention of consent with regard to impact on Indigenous territory; in any case, the Request for Proposals for HFR has been superseded by the Alto HSR proposal awarded to Cadence, now in co-development phase. Site selection and alignment have not yet been specified by Alto and Cadence. At the present time it is unclear whether any discussions have been undertaken with the Mohawk of the Bay of Quinte in Ontario or the Mohawk of Kanesatake in Quebec about use of or impact on their territories. Nor is there any evidence of commitment to recourse or accountability mechanisms for benefit/land/participation commitments that will be made to them.

    Section 7

    Environmental Impact

    For the route through the Frontenac Arch and Napanee Plain, environmental risks are significant. For the northern route largely over Canadian Shield, risks are less clear. For the southernmost corridor, environmental risks have already been incurred by the CN right of way and Highway 401; one would expect additional risks from HSR to be small by comparison. Doing nothing to shift travelers over to rail also incurs the environmental risks incurred by flying and driving, notably contributions to climate change. The difficult question is actually the normative question: which risks must be avoided? If worthwhile development is environmentally sustainable, then the answer is that we must avoid risks that are unsustainable, and this shifts the question to: what are the meaning and standards for sustainability?

    While precise answers to these normative questions are elusive, two broad ways of framing them have emerged over the past forty years to provide starting points for public deliberation about environmental risks. The 1987 Brundtland Commission proposed that development is sustainable when it meets the needs of present generations without jeopardizing the needs of future generations.20 More recently, the UNDP Human Development Report of 2020 called for steering development to ease the ‘planetary pressures’ that historical and contemporary social and economic development unleash.21 The main idea here is that development puts pressures on the planet, and the planet pushes back in ways that make present and future human flourishing more uncertain. At the extreme:

    Climate change and biodiversity integrity loss are tightly coupled core boundaries, and human activities are currently pushing both of them into a high-risk zone. If humanity breaches planetary boundaries too far or for too long, it may disrupt planetary life support systems, with substantial risks for human life as we know it.22

    The HSR corridor over part of the Frontenac Arch will also traverse an adjoining limestone plain surrounding the Napanee and Salmon Rivers. Under the limestone plain is found karst geology, featuring sinkholes, fissures, caves, and disappearing streams; above it are rare alvar ecosystems based on terrain with thin or no soil cover. These ecosystems harbour several species protected by the Species at Risk Act; it is doubtful that Alto could show that its construction can meet requirements of this Act. Construction would also affect subsurface water flows in unpredictable ways, possibly damaging freshwater access and use downstream. For other ecosystems in other places it may be possible to mitigate environmental impacts of HSR, as for example best practice standards have evolved in Europe for protecting essential pathways for migratory species. If such mitigation strategies can succeed for a CN/401 corridor, or for a northern shield corridor, they must be planned, budgeted, and carried out. However, in the Frontenac Arch and Napanee Plain these particular mitigation strategies may be of no use, due to the combination of karst geology below and alvar ecosystems above. Since biodiversity and freshwater access are two dimensions in which there are planetary boundaries, it follows that, in this corridor, an HSR line would be adding to planetary pressures rather than reducing them. Building HSR in the Frontenac/Napanee corridor, then, qualifies as environmental maldevelopment.23

    In the northern Shield corridor, biodiversity and freshwater impacts may be less pronounced and more amenable to mitigation. The HSR line and its construction are less likely to disrupt water flow in this corridor, where streams run parallel to rail alignment. The line would disrupt movement by larger mammals such as moose, elk, and bear, but these are not species at risk. More research is needed to determine what kinds of mitigation are required; international evidence suggests that there are few types of overpass that large mammals will actually use, and these are quite expensive.24 Effects on other species also requires further study and assessment. A clear standard for wildlife mitigation, with accountability mechanisms, is needed to ensure that adequate mitigation measures are chosen and implemented.

    Section 8

    Ranking the options: from morally worst to not so bad

    These two frameworks – future generations and planetary pressures – can help to orient discussion of environmental and social impacts in ethical, value-based terms. We can consider what will be the result of rolling out the various HSR options over multiple future generations. How will these decisions now affect planetary pressures exerted by humans then? Is it possible to assess or at least imagine how much closer to or in excess of planetary boundaries we get, in each scenario? In light of this, we can rank those options, as to how comparatively undesirable they are, from a development ethics perspective.

    The following rankings are only illustrative, expressing my own moral assessment, based on reasons for concern that I am aware of at the present time. This illustration, however, does have a point, namely that it is plausible and powerful to rank the options before us in terms of their enduring impact both to enhance human well-being and to reduce the dangerous pressures we are placing upon the planetary systems that sustain us. What we need, I conclude, is a public deliberation to make such a ranking.

    1
    Status quo.If there is no replacement for current VIA Rail levels of service, travelers will continue to be shunted into cars, buses, and airplanes to travel between Québec, Montréal, Ottawa, and Toronto (and indeed London and Windsor). The carbon footprint for this travel will grow apace. There being no other proposals on the horizon to compensate, I conclude that continuation of the status quo on VIA Rail will mean continued contribution to the death, illness, and destruction of property and habitats that result from carbon-induced climate change.
    2
    Frontenac/Napanee corridor, without mitigation.Mitigation for landowners and community safety are feasible and morally mandatory; however, for the sake of ranking consider the possibility that it is not carried out, so we have: unnecessary and inequitable loss to livelihoods and human security. In that respect, this option ranks worse than the following one:
    3
    Frontenac/Napanee corridor, with human/community mitigation.Well-being and equity issues in the previous option are removed, but, on the environmental side, ecological mitigation seems unlikely. Over many generations, then, the effects we can anticipate from HSR include (a) expansion of human well-being; (b) reduction in the particular pressures imposed by the carbon footprint of travel between Windsor and Québec; but (c) significantly increased planetary pressures both on biodiversity and on freshwater access.
    4
    Northern Canadian Shield corridor, without mitigation.Although much of this territory is more remote, there are still roads, tracks, and migratory paths that can be cut off by HSR fencing. Human security and wildlife migration will still be impacted unless mitigation measures are adopted.
    5
    Northern Canadian Shield corridor, with mitigation.With landowner and community mitigation, inequitable losses are reduced, so that we can anticipate (a) expansion of human well-being, along with (b) reduction in the particular pressures imposed by the carbon footprint of travel between Windsor and Québec; (c) with mitigation it may be possible to avoid increasing planetary pressures on biodiversity, but this is not perfectly clear, either; (d) adverse impacts on fresh water are less likely. Rolling this forward over multiple generations, we want to ensure monitoring for unforeseen environmental problems. This could be addressed by establishing capability in each region affected by HSR for ongoing environmental monitoring, funded by revenue sharing from operation of HSR service.
    6
    Southern CN/401 corridor, without mitigation.Because this corridor already exists, one might expect fewer new adverse impacts. However, without mitigation, mandatory grade separation and fencing will adversely affect humans and other species alike, which makes this option worse than the final one.
    7
    Southern CN/401 corridor, with mitigationfor community and wildlife impacts to highest standards of European/Asian HSR, with further direction from the environmental assessment. With landowner and community mitigation, inequitable losses are reduced, so that we can anticipate (a) expansion of human well-being. In addition, the problem of depriving service to Kingston is avoided. Over future generations we can also expect (b) reduction in the particular pressures imposed by the carbon footprint of travel between Windsor and Québec. Following best European/Asian practices, modified by site-specific environmental assessment, (c) with mitigation it may be possible to avoid increasing planetary pressures on biodiversity as well as (d) impacts on fresh water. Still, rolling this forward over multiple generations, we want to ensure monitoring for unforeseen environmental problems by establishing, in each affected region, capability for ongoing environmental monitoring, funded by revenue sharing from HSR operation.

    The worst option, according to this, is the status quo. Doing nothing now about intercity travel has the worst impact on well-being and planetary pressures for future generations. The Frontenac/Napanee options are not much better. An independent public panel, I believe, would confirm these rankings and could also shed more light on the others.

    Section 9

    Recommendations to the Government of Canada

    1
    Make corridor proposals public, including the CN/401 corridor. Immediately require Alto to develop and make public feasible alignment plans for (a) the CN/401 corridor, along with any alignment plans under active consideration for (b) the northern Canadian Shield corridor; and (c) the Frontenac/Napanee corridor. Require each of these plans to include cost estimates for wildlife and road crossings at high international standards, for land replacement to maintain farm viability, and for revenue sharing to fund ongoing monitoring of environmental impacts.
    2
    Make corridor choice a public choice. Prior to Final Investment Decision, appoint an independent public panel to recommend choice between corridor proposals (including the status quo), (a) on grounds of public interest, community impact, and environmental impacts/pressures; (b) considering these impacts for several generations (c) with powers to modify any proposals submitted, and (d) with a mandate to recommend mechanisms of recourse and accountability.
    3
    Obtain Indigenous peoples’ consent. Prior to Final Investment Decision, ensure that free and informed consent to impacts on their lands has been given by affected Indigenous peoples, along with mechanisms of recourse and accountability for community and environmental impacts on those lands as well as for commitments to Indigenous participation and community benefits.
    4
    Establish accountability mechanisms and environmental monitoring. Withhold Final Investment Decision until mechanisms of recourse and accountability have been established to support commitments for (a) landowners, (b) communities, (c) wildlife impacts, and (d) Indigenous communities. Do not invest in an HSR proposal that does not allocate revenue in the operational phase for ongoing regionally-controlled environmental monitoring.
    5
    Protect VIA Rail with legislation and funding. Establish service levels and funding streams for regional service along the Windsor-Montreal corridor and for VIA Rail’s non-corridor network – The Ocean, The Canadian, and remote services.
    Section 10

    Recommendations to Alto

    A1
    Corridor proposals. From the perspective of development ethics, corridor choice is not yours to make; this is properly a public choice. Accordingly, you are obligated to prepare development options for all of the feasible HSR corridors, to facilitate public choice among them.
    A2
    Request and obtain Indigenous people’s consent. Ensure that free and informed consent to impacts on their lands has been given by affected Indigenous peoples.
    A3
    Negotiate livelihood replacement. In negotiating with landowners, ensure that compensation covers livelihood replacement (including, for farmers, drainage and access to fields), including revenue sharing if necessary.
    A4
    Negotiate revenue sharing for ongoing regionally-controlled environmental monitoring during the operational phase.
    A5
    Negotiate mechanisms of recourse and accountability to support commitments made for (a) landowners, (b) communities, (c) wildlife impacts and environmental monitoring, and (d) Indigenous communities.
    References

    Notes

    1
    ALTO HSR Citizen Research Initiative, How History Led Us Here, March 2026, citizenresearch.ca/how-history-led-us-here, and Where We Stand on the Route, altohsrcitizenresearch.ca, accessed April 9, 2026.
    2
    Mahbub ul Haq, Reflections on Human Development (Oxford: Oxford University Press, 1995). Amartya Sen, Development as Freedom. (Cambridge, MA: Harvard University Press, 1999.
    3
    Peter Penz, Jay Drydyk, and Pablo Bose, Displacement by Development: Ethics, Rights, and Responsibilities (Cambridge: Cambridge University Press, 2011).
    4
    Smyth, Eddie, Susanna Price, and Frank Vanclay, ‘Fair and Equitable Land Access (FELA) by Development Projects: Enhancing Governance for Sustainable Development Outcomes When Projects Displace People,’ (Sustainable Development 2025, p. 3.
    5
    Ibid.
    6
    Penz, Drydyk, and Bose 2011, p. 211.
    7
    Union Internationale des Chemins de fer (UIC), ‘The Definition of High Speed Rail’ (UIC Communications: 2018). Accessed April 13, 2026. uic.org.
    8
    Wikipedia, ‘High-Speed Rail in Europe’ (March 31, 2026) en.wikipedia.org. Wikipedia, ‘Shinkansen’ (March 14, 2026) en.wikipedia.org.
    9
    While I find that this argument is sound, it is only fair to note that others disagree. The core argument I have outlined is supplemented with other lines of argument in Alto’s ‘Fast Forward’ document (Alto (VIA HFR – VIA TGF Inc.), ‘Fast Forward: Shaping Canada’s Future with a High-Speed Rail Network’ (March 2025) altotrain.ca) For opposing arguments see Tasnim Fariha, and David Jones, ‘High-Speed Potential, High-Stakes Decisions: The Policy Case for Alto’ (C.D. Howe Institute, December 11, 2025) cdhowe.org, Jerome Gessaroli, ‘Canada’s next Budget Bomb Is the Alto High-Speed Rail Project’ (Macdonald-Laurier Institute, January 14, 2026.) macdonaldlaurier.ca. The Citizens Research Initiative argues for upgrading the status quo to a ‘High Performance Rail’ system with top speeds not exceeding 200km/hr. (Where we Stand on the Route, op. cit.) For arguments that raise complications rather than expressing outright opposition, see also: Johnny Renton, ‘The Good, Bad and Awful of the Alto High Speed Rail Project, and How to Fix the Flaws and Concerns Surrounding It.’ (Substack: Next Stop, Downtown Canada, February 4, 2026) johnnyrenton.substack.com; Kathryn Smith Exon and Egon Terplan. ‘Keeping High-Speed Rail on Track: Learning from Other North American Projects’ (Toronto: School of Cities, June 6, 2025) schoolofcities.utoronto.ca; and Michael Schabas, ‘Alto Conceptual Design and Business Case” (January 12, 2026) available on Google Docs, Google Docs.
    10
    ALTO HSR Citizen Research Initiative, The Station Location Problem (2026) citizenresearch.ca/station-location.
    11
    Penz, Drydyk, and Bose, Chapter 7.
    12
    Nassir Mwanje, ‘Community Perceptions of Fair Compensation in Land Expropriation: Insights from Uganda through a Capability Approach’ (Journal of Human Development and Capabilities, forthcoming).
    13
    Ontario Federation of Agriculture, ‘High-Speed Rail’ (2026) ofa.on.ca/issues/high-speed-rail.
    14
    Alto (VIA HFR – VIA TGF Inc.), Advanced Engineering Driving High-Speed Rail (February 19, 2026) altotrain.ca.
    15
    ALTO HSR Citizen Research Initiative, Fire Services – Citizen Research (March 2026) citizenresearch.ca/fire-services, and Healthcare Access – Citizen Research (March 2026) citizenresearch.ca/healthcare-access.
    16
    ALTO HSR Citizen Research Initiative, ‘VIA Rail on the Kingston Subdivision: Service Erosion, Funding Collapse, and the National Rail Risk from ALTO HSR’ (April 2026) citizenresearch.ca/via-future.
    17
    Alto (VIA HFR – VIA TGF Inc.), ‘Building Together: Indigenous Partnerships in Alto’s Vision’ altotrain.ca.
    18
    United Nations, Declaration on the Rights of Indigenous Peoples (General Assembly, 2007) un.org
    19
    Alto (VIA HFR – VIA TGF Inc.). What We Heard & What We’re Doing Report. 2023. altotrain.ca.
    20
    World Commission on Environment and Development, Our Common Future (Oxford: Oxford University Press, 1987).
    21
    The ‘planetary pressures’ framework is based on several decades of ‘planetary boundaries’ research. To simplify: the core idea is that there are nine specific dimensions of planetary change that range from low risk to growing risk to high risk for human flourishing. Among these, ozone depletion, climate change, biodiversity, ocean acidification, land use change, and freshwater use are most familiar in the public sphere. A good entry point into the literature is Human Development Report 2020: The Next Frontier; Human Development and the Anthropocene, Chapter 2, ‘Unprecedented – The Scope, Scale and Speed of Human Pressures on the Planet’ (New York: UNDP, 2020), pp. 45-68.
    22
    UNDP op. cit., p. 51.
    23
    See Andrew Hyett, How Hydrology Shapes the Design – and Cost – of High-Speed Rail (March 2026) citizenresearch.ca, and the following publications by ALTO HSR Citizen Research Initiative (2026): Potential Effects of High-Speed Rail on the Napanee River citizenresearch.ca/napanee-river-2; A River in the Path of Two Rail Corridors citizenresearch.ca/salmon-river;
    24
    See Hyett op. cit. and two other publications of ALTO HSR Citizen Research Imitative (2026): The Wildlife Crossing Problem citizenresearch.ca/wildlife-crossings; Wildlife Connectivity, Hunting Heritage, and Game Species Habitat: Impacts of the Proposed ALTO High-Speed Rail Corridors citizenresearch.ca.
  • Sign first, see later

    Sign First, See Later

    A confidentiality precondition runs through ALTO’s field studies and corridor maps — for municipalities and for Indigenous rightsholders alike.

    The finding in brief

    Two of ALTO’s own June 2026 reports, read together, reveal a pattern. To let ALTO’s crews onto its land for field studies, the United Counties of Stormont, Dundas and Glengarry would first have had to sign a non-disclosure agreement; they declined. And to see the early corridor maps for their own territories, Indigenous communities were asked to sign a collaboration or confidentiality agreement first.

    In both cases the information came with the same condition attached: silence. This is a question of public trust, not of whether the trains are a good idea.

    “The most basic question — where might the line go? — was answered only after a confidentiality agreement was signed.”
    — the pattern across ALTO’s own June 2026 reports
    The Evidence

    What the documents show

    The pattern is set out not in commentary but in ALTO’s own records and a municipal council package — the same condition appearing in two separate processes, applied to two different kinds of party.

    The municipal case The rightsholder case
    Set out in the United Counties of SDG’s June 15, 2026 council package. ALTO sought a Permission to Enter agreement for environmental field study and geotechnical work — boreholes, test pits, and tree clearing — on county-owned parcels, with the Counties required to sign a non-disclosure agreement as a condition of access. Council declined the request. Set out in ALTO’s Indigenous Consultation What We Heard Report. Initial corridor maps, prepared in November 2025, were shared only with communities that had signed a collaboration agreement or a non-disclosure agreement. For the others, ALTO worked to secure non-disclosure agreements to share maps as early as possible (p. 14). A community could not see the corridor maps for its own territory until it accepted a confidentiality undertaking. View ALTO’s report

    A confidentiality clause is ordinary between two private companies. It is a different matter when the other party is a public body, or an Indigenous community being consulted about its rights.

    The Municipal Case

    What was actually requested

    ALTO sought a “Permission to Enter” (PTE) agreement covering two kinds of work. The first is environmental field study — wetland and habitat assessment, wildlife and bird surveys, and the collection of noise, vibration, hydrology, soil and archaeological data, described as largely non-invasive. The second is geotechnical investigation: boreholes, test pits and other ground disturbance to characterise what lies beneath the surface. The County’s own report notes that this second category would require clearing trees to bring in heavy equipment, with the land to be “restored” afterward.

    The agreement also runs in favour of the private developer consortium, Cadence, not only the Crown corporation — so a landowner’s signature binds them to both. And it requires the landowner to keep the arrangement confidential.

    The request and its supporting materials are on the public record in the United Counties’ June 15, 2026 council package: the CAO Key Information Report, the ALTO presentation of May 5, 2026, and the Map of Impacted SDG Properties.

    “It tells you nothing about the route”

    ALTO’s presentation states, more than once, that a Permission to Enter does not indicate the final alignment and is not proof that a property sits on the route. Yet the same council package includes a map that identifies specific “Subject Lands,” and the geotechnical work is targeted at named parcels. You do not drill boreholes everywhere; you drill where you expect to build.

    On the public record

    In March 2026 the Mayor of North Glengarry said the alignment had shifted from the existing rail line through town to the township’s “far northeast corner” — the area, next to Highway 417, where the identified study parcels sit. The claim that the studies reveal nothing about the route, and the targeted footprint of the work, do not sit easily together.

    “A municipality holds and shares information on behalf of its residents. A non-disclosure agreement is the one condition it cannot quietly accept.”
    — the transparency question the request puts to a public body
    The Analysis

    A pattern, not an exception

    A municipality holds and shares information on behalf of its residents; an Indigenous community is being consulted toward its free, prior and informed consent. In both settings, the value of the process depends on people being able to know — and to discuss — what is proposed for their land. A precondition of silence cuts against that.

    What makes this a pattern rather than a one-off is that the same condition appears in two separate processes, applied to two different kinds of party, documented in the same set of reports. It is part of how the project is being run.

    Why confidentiality changes the calculus

    A public body that signs a non-disclosure agreement narrows what it can tell residents about studies on public land, and narrows what is reachable under freedom-of-information law. A rightsholder asked to sign before seeing a map is asked to accept a constraint before it has the information needed to weigh the project. Informed consent and an informed public both depend on having the information first.

    Consent and Transparency

    The tension the precondition creates

    ALTO states that it consults Indigenous communities with the aim of securing their free, prior and informed consent. Consent is harder to call fully informed when the information is released only after a confidentiality agreement, and harder to call fully free when seeing the map requires signing first. None of this is to say that any community objected to the agreements — the report does not say so, and this brief does not speak for any community. The observation is narrower, and is about ALTO’s process: the condition it attaches to its own information.

    For municipalities, the duty runs the other way — toward openness. Ontario’s freedom-of-information regime exists precisely so residents can learn what public bodies know. An access agreement that forecloses disclosure sits in tension with that duty, which is part of why the United Counties declined.

    The Decision

    What the municipalities decided

    The refusals were not isolated. The body that owns the land said no; the host township and a regional caucus were already on record against the project; and a neighbouring county refused the very same non-disclosure agreement.

    United Counties of SDG — the landowner

    The Counties, which own the land, voted down the access request (By-Law No. 5538). Councillors pointed to the impact on agriculture and were wary that granting access would itself be read as support for the project.

    North Glengarry — the host township

    The township where the parcels sit had already endorsed the regional resolution opposing the project in its current form, and its mayor and council have continued to speak against it.

    Prescott-Russell — the neighbour

    On May 27, 2026 the neighbouring United Counties of Prescott and Russell unanimously refused to sign a non-disclosure agreement and declined access for surveys, with the warden framing it as a stand for transparency and local autonomy. Council minutes

    Eastern Ontario Wardens’ Caucus

    The regional caucus opposes the project in its current form — the resolution North Glengarry endorsed in April 2026.

    What To Watch

    What happens next

    The field studies are active and, by ALTO’s own account, will continue through 2026 and beyond. The southern route now under study — through Kingston and the Frontenac Arch — will not reach public consultation until 2027. Access to the ground, and the agreements that come with it, can arrive well before the public conversation does.

    The next test is a willing host. Kingston has asked for a station and wants its staff to work directly with ALTO. A municipality that wants the outcome may accept terms a reluctant one refused. Whether the confidentiality precondition travels south, and whether it has already been signed anywhere, can be tested directly: through freedom-of-information requests to the municipalities along the route.

    Anticipated Objection

    “Isn’t this just opposition to high-speed rail dressed up as a complaint about process?”

    No. The concern is the terms on offer, not the existence of a railway. The refusing councils have not asked for no rail; they have asked that the project coordinate with existing passenger service and existing corridors, and that decisions be made in the open. The question is not whether ALTO may protect commercially sensitive information — firms do that routinely.

    It is whether the public’s information about a public project, on public land and on the territories of rightsholders, should be available only to those who first agree not to share it. Better passenger rail and an open process are not in conflict.

    The bottom line

    The question is not whether ALTO may protect commercially sensitive information — firms do that routinely. It is whether the public’s information about a public project, on public land and on the territories of rightsholders, should be available only to those who first agree not to share it.

    A reasonable standard would be simple: the corridor maps, field-study scopes, and access terms that affect a community should be available to that community without a confidentiality precondition. Better passenger rail and an open process are not in conflict.

    Read the full brief offline or share it.

    Download the brief (PDF)

    Sources

    Primary documents and statements

    1.

    ALTO, Indigenous Consultation What We Heard Report (June 2026), incl. p. 14 — initial corridor maps shared only with communities that had signed a collaboration or non-disclosure agreement; ALTO describes the agreements as a means of sharing maps as early as possible. altotrain.ca
    2.

    ALTO, Public Consultation What We Heard Report (June 2026).
    3.

    United Counties of SDG council package, June 15, 2026 — CAO Key Information Report; ALTO presentation, May 5, 2026; Map of Impacted SDG Properties; and By-Law No. 5538.
    4.

    The SDG access vote and councillor statements as reported by the Morrisburg Leader, June 18, 2026.
    5.

    North Glengarry’s April 13, 2026 endorsement of the regional (EOWC) resolution, and its mayor’s continued public opposition — The Review, April 16, 2026, and Cornwall Seaway News.
    6.

    United Counties of Prescott and Russell, Regular Council Meeting, May 27, 2026 — council declined to sign a non-disclosure agreement and refused access for surveys. Meeting agendas and minutes
    7.

    Transport Canada announcement, Kingston, June 22, 2026.
  • Heard not counted

    CRI analysis · June 2026

    Heard, Not Counted

    Alto’s What We Heard report is precise about how many people it reached and silent about what they said. That silence is not an omission — it is the design.

    Alto HSR Citizen Research Initiative · Independent & non-partisan

    What Alto counts, exactly

    324,026 unique online visits
    24,142 questionnaires completed
    19,903 map pins dropped
    14,503 media mentions

    What Alto leaves uncounted

    — how many raised each theme
    — concerns by category
    — any sentiment split
    — which issues mattered most

    The same report, two standards of precision: six significant figures for the inputs, no number at all for the outputs.

    The argument

    The report is accountability-shaped but accountability-proof. It maximizes the visible evidence that consultation happened while removing every element that would let anyone test what it produced — so that hearing is decoupled from consequence.

    1

    The smoking gun: asymmetric precision

    The clearest evidence isn’t interpretive — it’s on the page. Alto reports its inputs to six significant figures and its outputs with no number at all (see the ledger above).

    The qualitative colouring is asymmetric in the same breath. In adjacent sentences of the executive summary, support gets intensifiers and active voice — nation-building “viewed positively, alongside strong enthusiasm,” supporters who “expressed a desire” to move forward. Opposition gets neutral process-verbs and passive voice — land-acquisition opposition “was voiced,” concerns “raised… on many occasions.” Both are unquantified; one is painted warm and active, the other cool and passive. That asymmetry, in a single paragraph, is the legitimation machine in miniature.

    2

    A report that cannot be wrong

    The report says its themes were produced by “Artificial intelligence tools… semantic clustering, multi-label classification,” which also “were used to support report writing.” Add the absence of magnitude, the absence of attribution, and the instruction that the themes “are not presented in a specific order and they are all significant” — and the report becomes structurally unfalsifiable.

    There is no figure to check against the inputs, no ranking to dispute, no claim that could be shown false. “All significant” is not a finding; it is a flattening — it pre-emptively denies that overwhelming, concentrated opposition would look any different from a scatter of mild concerns. A report that cannot be wrong is not a record. It is a position statement wearing a record’s clothes.

    3

    The frame was set before the room opened

    The corridor that was consulted on was drawn first — from technical and financial criteria (“the straightest possible route,” “minimizing construction costs”) and the three 2025 RFP submissions — and then presented for feedback. The exercise is explicitly “corridor refinement”: consultation on the width of a band already drawn from cost-minimization, not on whether or where. The seven “project outcomes” are stated as fixed premises the consultation serves, never as propositions it could test.

    The consultation’s frame excludes the project’s own justification. A participant could object to a curve; they could not put on the record that the stated outcomes might be better met by upgrading existing lines — the question the public itself kept raising as “improve VIA first.” The frame did the foreclosing; the consultation only refined inside it.

    4

    Consent invoked, consent disclaimed

    Both reports invoke “Free, Prior, and Informed Consent” — and the word doing the work is consent. Yet the report never claims consent was obtained; it says Alto consults “with the aim of securing” it, then states flatly the process “is not a rights determination process.” It wears the standard as a credential while disclaiming the thing the standard names.

    Its own numbers undercut the credential: of 40 Indigenous communities contacted, 29 held meetings and 12 made further submissions — a thinning base for a report it calls “validated.” And corridor maps were shared only with communities that had signed a collaboration or non-disclosure agreement. Consultation conducted under NDA is a contradiction in terms for a public, rights-bearing process: you could only see what you were consulted on by signing away the ability to discuss it.

    5

    Responsiveness, staged

    The report — which documents Kingston-area demand — was released the same day, at Queen’s University, alongside the Minister’s direction to study a southern route through Kingston. The sequence manufactures a narrative of listening and responding. But the response is a direction to study, hedged twice (“potential,” “subject to technical feasibility”), and the real consultation on that segment is pushed to 2027. The report stages responsiveness in the present while deferring the substance past the next news cycle.

    6

    What this argument does not claim

    A sharper critique is also a more honest one. Naming what Alto can rebut makes the rest land harder.

    • Not that Alto ignored concerns. It didn’t — the southern-corridor section names farmland, the Frontenac Arch, karst and groundwater specifically. The defensible claim is narrower and deadlier: Alto records concerns in a form that cannot be acted on or audited.
    • Not that the comment counts are bad faith. The public-facing range (“nearly 20,000” vs “nearly 45,000”) is two framings and partly an artifact of windowing and de-duplication. The fair point is rhetorical: Alto’s own site reaches for the smaller number.
    • Not that using AI is the flaw. The flaw is that the taxonomy is undisclosed and the outputs unquantified. The target is the opacity, not the method.
    • Not that this was a representative poll. Neither report claims it was. The platform measures the intensity of the concerned — which is exactly why the absence of any sentiment or geographic breakdown is the tell.

    The line that holds

    Alto published a 134-page account of a consultation that is precise about how many people it reached and silent about what they said — and that silence is the product, not an omission.

    Download the full brief (PDF)

    Sources

    1. Alto, Public Consultation — What We Heard Report, Corridor Study Area (134 pp), June 2026.
    2. Alto, Indigenous Consultation — What We Heard Report, Corridor Study Area (24 pp), June 2026.
    3. Transport Canada, news release on the What We Heard report and Kingston as a potential stop, June 22, 2026. canada.ca

    Quoted phrases are taken directly from the reports named above. The Alto HSR Citizen Research Initiative is an independent, non-partisan research project examining the proposed high-speed rail corridor through Eastern Ontario. This analysis addresses how the consultation was reported; it takes no position here for or against the project itself.