Tag: station siting

  • Would and Alto stop help kingston

    Would an ALTO Stop Help Kingston?

    Kingston has one of the busiest stations on the network. The question that matters is not whether it gets a stop, but whether a stop would leave more people riding the train, or fewer.

    ⚠ What has been said, and what has not been published

    ALTO’s chief executive has said Kingston will probably get a station, and that most trains would pass through without stopping. Neither the timetable nor the location of the station has been published.

    Those two missing facts are exactly the ones that decide the outcome. This brief therefore tests the range: today’s railway, a faster conventional railway using the existing station, and ALTO with a station either inside the city or a twenty‑seven‑minute drive north of it, at normal fares and at fares 25 per cent higher. Every number that goes into the model is listed, so any of them can be argued with.

    The short answer

    Of the options tested, only one leaves Kingston with more rail trips than it has today: a faster conventional railway serving the existing station, at about 12 per cent more. The best ALTO case — a station inside the city, at normal fares — roughly matches today. Every other ALTO case comes out below today’s service, by 8 to 17 per cent.

    The reason is simple. Speed is only one part of what makes a train trip worth taking. ALTO’s faster run to Toronto is worth about 10 per cent more trips on its own. But cutting the number of daily stops from eighteen to eight gives that back. Charging 25 per cent more gives it back again. Moving the station twenty‑seven minutes north of the city costs another 6 to 8 points on top.

    Running more trains cannot rescue it by itself. Even at eighteen stops a day, matching what Kingston has now, an out‑of‑town station at a premium fare still comes out around 9 per cent below today. And about 8 per cent of Kingston’s trips — Belleville, Brockville, Cobourg, Napanee, Oshawa — have no ALTO equivalent at any frequency, because high‑speed trains do not stop at those places.

    Download
    Kingston’s ALTO Ridership Analysis — Full Brief (PDF)
    Full method, all parameters, sensitivity ranges and break‑even tables
    Download PDF
    The Comparison

    Six versions of Kingston’s railway

    The table below is the whole brief in one place. The first row is what Kingston has today. The second is a faster conventional railway from the same station. The last four are ALTO, differing only in where the station sits and what the ticket costs.

    +12%
    faster conventional railway, existing station, same number of trains, normal fares
    the only option that grows ridership
    0%
    best ALTO case: station in town, normal fares, eight stops a day
    matches today, does not beat it
    −17%
    ALTO station 27 minutes north, eight stops a day, fares 25% higher
    central case for an out‑of‑town station

    Table 1 · Headline comparison

    OptionTo TorontoStops a dayFare premiumAnnual tripsChange
    Today’s service135 min18none450,000
    Faster conventional railway, existing station95 min18none502,000+12%
    ALTO, station in town80 min8none449,0000%
    ALTO, station in town80 min8+25%403,000−10%
    ALTO, 27 min north80 min8none416,000−8%
    ALTO, 27 min north80 min8+25%376,000−17%

    All four ALTO rows assume eight stops a day and that today’s conventional service is withdrawn. They differ only in where the station is and what the ticket costs. No fare structure for intermediate stations has been published, so both possibilities are shown rather than assumed. The faster conventional railway is the 240 km/h new‑build line proposed under the High Performance Rail framework, serving the existing station.

    Starting Point

    Why Kingston already rides the train

    Kingston’s place among the busiest stations on the network gets cited as the reason it should have a high‑speed stop. But what produces that ridership decides whether a different kind of station would reproduce it. Four things do most of the work, and a high‑speed alignment north of the city removes two of them.

    It gets two sets of trains, not one

    Kingston sits halfway along the Toronto–Montréal mainline, and the Toronto–Ottawa trains use the same track as far as Brockville. So Kingston collects two timetables instead of one, and ends up with a level of service beaten only by the three biggest cities on the corridor. Frequency matters to ridership on its own, quite apart from speed: in intercity rail, a 10 per cent increase in service typically brings 4 to 7 per cent more trips.

    The station serves a region, not a city

    Napanee, Gananoque, Amherstview and the western Thousand Islands have no intercity rail of their own, so people drive to Kingston to catch the train. Ridership credited to a city of 132,000 is actually generated by an area several times larger.

    The population is unusually inclined to take the train

    Roughly forty thousand post‑secondary students live in a city of about 132,000, one of the highest ratios in the country. Many come from the Toronto and Ottawa regions and travel without a car. Kingston also has a large retired population, for whom avoiding the highway is the point of the trip, and an unusually high share of hospital, university, military and public‑sector jobs where travel is expensed and defaults to rail.

    But that ridership is hard to charge a premium for

    This travel is not spread evenly. It piles up at term boundaries, Thursday and Sunday afternoons, reading weeks and holidays, and it creates a matching flow of families travelling to Kingston. These are the travellers most sensitive to how often trains run and how far the station is from where they are going, and the least able to just drive instead. They are also the least profitable: peaked, price‑sensitive, and largely outside the weekday business hours a high‑speed operation’s revenue depends on.

    Two things worth being clear about

    The ridership figure itself is not published. Kingston’s standing as one of the busiest stations rests on statements by the operator and the Minister, not on released station‑level data. That is the first item on the list of things that should be published, at the end of this brief.

    Existing demand is not the same as new demand. Busy today proves Kingston already travels by train. It does not prove that a different station would generate additional trips. Only new trips add ridership to the corridor.

    There is also no flight from Kingston to Toronto. Elsewhere, high‑speed rail wins its premium passengers off aircraft. In Kingston those passengers are already on the train, so there is nobody to convert. Extra trips can only come out of cars, or be created from nothing.

    Both of the things that built Kingston’s ridership — frequent trains, and a station within the city, roughly ten minutes from the core and the university — are the two things a high‑speed alignment north of the city takes away. That is what the model is built to test.

    Method

    How the numbers were worked out

    Every trip is priced in minutes. Add up the time on the train, the time getting to and from the station at each end, the waiting created by having fewer trains, and the fare converted into minutes using what an hour is worth to that kind of traveller. Time spent driving to a station or standing on a platform counts for more than time sitting on a moving train, because people dislike it more. Journeys that involve changing trains carry an allowance for the change. That matters for one market in particular: ALTO reaches Montréal from Kingston by way of Ottawa, so some of those journeys involve a change, where a direct lakeshore railway does not.

    That total is the real cost of the trip. If it goes up, fewer people travel. If it goes down, more do. The response used here is roughly one for one: make the total 10 per cent better and you get about 10 per cent more trips.

    Travellers are split into four destinations and four types, each divided by whether they have a car available: thirty‑two groups, each worked out separately and then added up. That matters because a student without a car and an expensed public‑sector traveller react to a distant station in completely different ways.

    Table 2 · Everything the model assumes

    InputValue used
    Trips today450,000 a year through the station (tested from 400,000 to 550,000)
    Where people goToronto 58%, Ottawa 22%, Montréal 12%, other corridor stations 8%
    Who travelsStudents 30%, seniors and leisure 25%, public sector 20%, other 25%
    Share without a carStudents 85%, seniors and leisure 50%, public sector 15%, other 20%
    Worth of an hour$14, $20, $48 and $24 respectively, in the same order
    Time on the trainToday 135 / 120 / 160 min; ALTO 80 / 45 / 105 min (Toronto / Ottawa / Montréal)
    Getting to the stationExisting station 10 min by car, 20 by transit; ALTO 27 by car, 35 by shuttle
    How that time is weighted1.5 times if a car is available, 2.0 times if not
    WaitingHalf the gap between trains, weighted at 0.5, across a fifteen‑hour day
    ALTO fare premium25% in the central case; 0% and 40% also tested
    Sensitivity of demandOne for one in the central case (tested from 0.8 to 1.2)

    Far‑end access time is held identical in every scenario, which is a conservative choice: it gives ALTO the benefit of the doubt at the Toronto and Ottawa ends.

    Two possible futures for today’s trains

    Every service level is tested twice, because the answer depends less on ALTO than on what happens to the service Kingston already has.

    Replacement

    ALTO becomes Kingston’s rail service to Toronto, Ottawa and Montréal, and conventional service is withdrawn or cut below a useful level. Trips to Belleville, Brockville, Cobourg, Napanee and Oshawa lose their train altogether.

    Both together

    Today’s service keeps running at present frequency and ALTO is added on top. Travellers pick whichever is cheaper in total, and only the improvement over the better of the two creates new trips.

    What is assumed rather than known

    Four inputs are estimates, not published data: the number of trips today, where those trips go, ALTO’s journey times (the alignment for this stretch has not been published), and where the station would be. All four appear on the list at the end of this brief. The model also applies a constant response to a very large change in trip cost, which is at the outer edge of where this method behaves well. The direction of the results is solid. The exact sizes are indicative.

    Result One

    Where the speed gain goes

    Start with today’s service and change one thing at a time. This is the clearest way to see why a faster train can still end up with fewer passengers.

    Table 3 · One change at a time

    StepAnnual tripsChangeEffect of this step
    Today’s service, as it runs450,000
    Cut the Toronto run to 80 minutes, change nothing else496,000+10%+10 pts
    Cut stops from 18 a day to 8449,0000%−10 pts
    Add a 25 per cent fare premium403,000−10%−10 pts
    Move the station 27 minutes north376,000−17%−6 pts

    The second row is the entire value of high‑speed running time at Kingston: about 10 per cent. Each of the three things that come with it takes back as much or more. This calculation already leaves out trips to other corridor stations, which a high‑speed line cannot serve at any frequency.

    Result Two

    More trains cannot fix it on its own

    Suppose the number of stops is the thing that gets negotiated. Hold the station twenty‑seven minutes north and the fare 25 per cent higher, and vary how often ALTO calls.

    Table 4 · ALTO at a station 27 minutes north

    Stops a dayAnnual tripsChangeRangeIf today’s trains stay
    6359,000−20%−17% to −24%0%
    8376,000−17%−13% to −21%0%
    10387,000−14%−10% to −18%+0.2%
    18408,000−9%−4% to −14%+1.6%
    12 (six each way)394,000−12%−9% to −17%+0.5%
    16 (eight each way)404,000−10%−6% to −15%+1.3%
    20 (ten each way)411,000−9%−3% to −14%+1.9%

    The range covers the whole plausible span of the model’s assumptions, at a 25 per cent fare premium. The bottom three rows read six, eight and ten as stops each way, which is the most generous reading available. It improves the result without changing the sign. The last column is the “both together” case, where today’s service survives: ALTO then adds almost nothing, because travellers only switch when it is genuinely better for them.

    The fare premium matters more than the timetable

    Table 5 · What moves the answer

    Stops a dayNormal faresFares +25%Fares +40%Station 25 min outStation 45 min out
    6−12%−20%−24%−17%−23%
    8−8%−17%−21%−13%−20%
    10−5%−14%−19%−10%−17%

    The last two columns hold the fare premium at 25 per cent and vary the drive from the station to downtown; the central case is 27 minutes. Notice that going from normal fares to a 25 per cent premium costs more than doubling the distance to the station.

    How many trains would it actually take?

    The more useful question is what it would take for an out‑of‑town ALTO station to be no worse for Kingston than the service it already has. At normal fares the answer is nine stops a day for everyone. At a 25 per cent premium, the answer falls apart.

    Table 6 · Daily stops needed just to match today, Toronto trips

    Who is travellingAt normal faresAt a 25% premium
    Public sector and institutional (expensed)913
    Other business and leisure927
    Seniors, leisure, visiting family948
    Students and young adults9no number works

    Forty‑eight stops a day is a train every twenty minutes all day. For students, no frequency at all makes up for a distant station plus a premium ticket, because their time is worth less than the fare increase costs them.

    One case runs the other way and should be said plainly: expensed public‑sector travel between Kingston and Ottawa is better off under ALTO in every scenario tested, because today’s service on that pair is slow and indirect. It is a real gain, and it is a small share of the total.

    Under the friendliest assumptions available — normal fares, a station twenty‑five minutes out, today’s trains kept running alongside, ten stops a day — the best figure the model will produce for an out‑of‑town Kingston station is about +8 per cent. Getting there means giving up the premium pricing the revenue case depends on everywhere else.

    Result Three

    What if you just made today’s trains faster?

    Now reverse the test. Keep the existing station, keep eighteen stops a day, keep normal fares, and change nothing but speed on the existing route.

    Table 7 · Speed alone, from the existing station

    Toronto journey timeTime savedAnnual tripsChange
    135 min, as it runs today450,000
    118 min, reliable 160 to 177 km/h13%471,000+4.6%
    95 min, a 240 km/h conventional railway30%502,000+11.6%
    80 min, upper bound for this station41%525,000+16.6%

    The last row applies high‑speed running time to the existing station. It is there to separate speed from station location, frequency and fare, not as a proposal.

    The comparison that matters

    Eighty minutes to Toronto from the existing station, eighteen stops a day, normal fares: about +17 per cent. The same eighty minutes from a station twenty‑seven minutes out of town, eight stops a day, fares 25 per cent higher: about −17 per cent.

    The time on the train is identical. The two outcomes are thirty‑four points apart, and every one of those points is station location, frequency and fare.

    Speed gives diminishing returns

    Roughly speaking, every 1 per cent cut in journey time buys about 0.4 per cent more trips. A 30 per cent time saving buys about 12 per cent more passengers. For most of Kingston’s travellers, time on the train is a minority of what the trip really costs them — fare, getting to the station and waiting make up the rest, and speed does nothing about any of those. The gain concentrates where an hour is worth most: on a 95‑minute conventional railway, public‑sector travel grows about 17 per cent, business and leisure 13, seniors and leisure 12, students 10.

    A conservative figure, and a warning

    These figures are cautious. The response to journey time implied here is weaker than the rail literature usually finds, because the fare term in the calculation dampens it. Using a more standard figure, the same 30 per cent time saving would give about +22 per cent rather than +12. Table 7 should be read as a floor, with the 95‑minute case plausibly worth anywhere from +10 to +25 per cent. The comparisons earlier in the brief are unaffected, because they compare like with like.

    The warning is that fares erode the gain fast in either direction. Raising tickets 10 per cent to help pay for an upgrade cuts the benefit from about +12 per cent to about +7 — two‑fifths of the speed gain eaten by a 10 per cent fare rise. That is the same mechanism that sinks the high‑speed cases, working here on the alternative. It is an argument for funding an upgrade from capital rather than from the farebox.

    What It Means

    A stop is not the same as service

    Three things set whether Kingston gains or loses, and speed is not one of them: how far the station is from where people are actually going, what the ticket costs, and whether today’s trains survive. Frequency cannot rescue the result on its own. At eighteen stops a day, matching today, an out‑of‑town station at a premium fare still comes out around 9 per cent down.

    A public debate about whether Kingston gets a station, and how many trains stop there, is a debate about the wrong variables.

    The two things ALTO has said do not fit together

    A station justified by strong ridership, but served by a minority of trains, has its timetable set by the express service rather than by the demand used to justify it. Table 6 shows why that is not a workable compromise: the frequency needed to make the station work at a premium fare is far above what an express pattern tolerates. The usual international answer is two tiers, express and semi‑fast, which needs somewhere for fast trains to overtake at the intermediate station. Whether the cost estimate includes that overtaking capacity is a question with two possible answers, and both are informative.

    A conventional railway does better here

    A new conventional railway built for 240 km/h, running typically at 200, serves Kingston without moving the station, without the fare premium high‑speed operation needs, and without cutting the number of trains that stop. It captures a smaller share of the theoretical time saving and a larger share of the ridership. That is the trade the tables above quantify.

    What Would Change the Answer

    Three commitments, and four documents

    None of this is a prediction that a Kingston station must fail. The results turn on assumptions, and those assumptions are all things the project could settle.

    Would help
    A station much closer to the core, or a frequent connection to it that is committed and timed to the trains rather than hoped for.
    Would help most
    Normal fares on Kingston journeys. Table 6 shows this is the single decisive variable. A premium fare is what makes the arithmetic unrecoverable for students, seniors and leisure travellers.
    Would help
    A binding commitment that service on the existing line is maintained, which turns the replacement case into the both‑together case, plus a published timetable, so frequency becomes a fact instead of an assumption.

    Four things that should be published

    Before any of these figures are treated as more than an order of magnitude, four inputs should be replaced with real data:

    Not published
    Station‑level boardings and destinations. This alone would settle both the number of trips today and where they go. A matter for the operator.
    Not published
    The calling pattern assumed for the Toronto–Ottawa segment — how many trains actually stop, and where.
    Not published
    The fare structure for intermediate stations. On the evidence above, this matters more than anything else on the list.
    Not published
    The station location, with the assumed travel time from it to downtown Kingston.

    The first sits with the operator. The other three sit with the project and its joint project office, whose report and business case remain unpublished.

    The finding that matters

    It is not that a Kingston station would fail. It is that the service Kingston already has is the benchmark the project has never been asked to beat — and on the assumptions set out here, it does not beat it.

    Download Full Brief
    Kingston’s ALTO Ridership Analysis (PDF)
    Full method, all thirty‑two market segments, sensitivity bands and break‑even calculations
    Download PDF
  • Which trains stop in kingston

    Which Trains Stop in Kingston?

    A probable station, an unpublished route, and the conditions Kingston City Council actually set.

    ⚠ New Statement: ALTO CEO on a Kingston Stop

    On 22 July 2026, ALTO chief executive Martin Imbleau told CBC Radio’s Ottawa Morning that Kingston will probably receive a station, citing demand — It’s doable, the ridership is very strong — because Kingston is a large community. In the same interview he said that most ALTO trains would pass through Kingston without stopping, along with Laval and Trois-Rivières, in order to preserve express service between the larger cities. CBC News

    No alignment has been published for the segment that would carry the station. ALTO has said the Montréal–Ottawa route goes to public feedback this autumn, with the Toronto–Ottawa segment — the one containing Kingston — to follow.

    Critical Finding

    The two statements cannot both carry the weight assigned to them. If Kingston’s demand justifies building a station, it justifies serving it; if the timetable cannot absorb the stop, something other than the ridership case is driving the decision. But the more consequential question is not whether Kingston receives a platform. It is how many useful trains Kingston has the day the line opens, counting both operators — and on that question the announcement is silent.

    Kingston City Council’s support is not unconditional and never was. Resolution 2026-73, adopted 17 February 2026 by a vote of 9–2, makes support for a southern route contingent upon development along the Highway 401 corridor around the South Frontenac and Kingston region and on a new stop being added in Kingston. It further asks that the route and stop sit as close to the urban core as possible, and resolves that if there is no station in Kingston, council formally opposes the southern route. Of these, the 22 July statement addresses one, provisionally. The 401 contingency and the urban-core request are not addressed at all.

    Meanwhile the service Kingston already has is exposed from the other direction. Transport Canada’s 2025–26 estimates record funding to support the planning and eventual transfer of VIA Rail’s Québec City–Windsor corridor operations to the private partner. More than 80 per cent of VIA Rail’s revenue comes from that corridor. A station served by a minority of ALTO trains, combined with a thinned conventional service on the existing line, can leave Kingston with fewer useful daily trains than it has today.

    The Arithmetic

    What an intermediate stop costs at 300 km/h

    A station call on a high-speed line is expensive in a way that is easy to underestimate. The train must decelerate from line speed, dwell at the platform, and accelerate back to line speed. On comparable systems the round-trip cost of a single intermediate stop is on the order of four to six minutes, before any allowance for the slower alignment geometry often required to reach a city-centre location.

    That penalty falls on every through passenger, on every train that stops. Because the project’s commercial proposition is journey time between the anchor cities, the timetable resolves the conflict in the predictable direction: the stop is retained, and most services are routed past it. This is what the chief executive described on 22 July, and it is a rational operating decision given the design speed.

    What it does not resolve is the capital exposure. The station, its platforms and approach works, and whatever alignment concession is required to bring the corridor within reach of Kingston are paid for in full, irrespective of how many trains call. A station served by a minority of services carries close to the full cost of one served by all of them while delivering a fraction of the utility. The frequency a passenger actually experiences — not the presence of a platform — determines whether a station changes travel behaviour.

    This is not an argument that Kingston should be excluded. It is an argument that a stop and a useful service are different commitments, and that only the first has been signalled.

    The Municipal Record

    What Kingston City Council actually resolved

    9–2
    council vote adopting Resolution 2026-73, as amended
    17 February 2026, meeting 2026-06
    33
    weekly Kingston stops the deferred VIA express pilot would have removed
    September 2025 proposal
    2029
    end of the development phase, after which the federal government decides whether to proceed
    ALTO briefing to council, February 2026

    In March 2025, on a motion from the mayor, Kingston City Council voted unanimously to withdraw its support for ALTO. The stated grievance was the change from VIA Rail’s earlier High Frequency Rail proposal, under which Kingston was to have been a regional hub.

    On 17 February 2026, council reversed that position. Senior ALTO representatives briefed council that evening, immediately before the vote. Eight delegations spoke to the motion — among them Queen’s University, Kingston Health Sciences Centre, the Downtown Kingston Business Improvement Area, Kingston Accommodation Partners and the Corridor Train Alliance; the minutes record none opposed. A motion to defer consideration to the March meeting was lost 3–8. Resolution 2026-73 then carried as amended, 9–2, with Councillors Glenn and McLaren opposed.

    The adopted text is more specific than the public discussion of it has generally been. Its four operative clauses:

    Clause 1 — the request

    Calls on the federal Minister of Transport to enhance ALTO’s mandate to include the addition of a Kingston stop on the proposed ALTO High-Speed Rail Southern Route between Peterborough and Ottawa.

    Clause 2 — the contingency

    Expresses support for a southern route contingent upon development along the Highway 401 corridor around the South Frontenac and Kingston region, and provided there is a new stop added that is in Kingston.

    Clause 3 — the location request

    Requests that the southern route and planned stop be located as close to the urban core of the city as possible.

    Clause 4 — the trigger

    Resolves that if there is no station in Kingston, council formally opposes the creation of the ALTO southern route as one that would bypass Kingston and offer no benefit to the city or Eastern Ontario.

    Clauses 1 and 2 do not describe the same corridor. The first asks the Minister to add a stop to the proposed southern route — the alignment already on the table, which despite its name still passes north of the city, and on which a station would sit roughly 25 to 30 minutes by road from downtown Kingston. The second makes support conditional on a Highway 401 alignment. The 401 contingency entered by amendment (carried 8–3); a second amendment (10–1) softened clause 2’s endorsement of the existing route, and left clause 1 as drafted.

    The word “southern” has caused some confusion locally. It describes a route that is southern relative to the Havelock alignment through Peterborough — not one that approaches the lakeshore or the existing rail corridor through Kingston. The practical question for the city is therefore not downtown versus not-downtown. It is whether a Kingston station would be co-located with the existing VIA Rail station, inside the city and inside the existing network, or built new on the far side of it.

    That is the inconsistency the two dissenting councillors identified on the night. Their objection was that language open to interpretation would be interpreted by others, and that Kingston risked breaking faith with South Frontenac Township — whose own council had days earlier opposed the line through the township and backed a route through Kingston instead.

    “The details do still matter.”Councillor Conny Glenn, on the February motion — reported in The Kingston Whig-Standard, 18 February 2026

    Five months later, ALTO can satisfy clause 1 without satisfying clause 2. A probable stop on the existing proposed southern alignment answers the request while leaving the contingency untouched — and nothing said on 22 July distinguishes between them.

    What Resolution 2026-73 conditions support onWhat the 22 July statement provides
    A new stop in Kingston (clauses 1, 2 and 4). Absent one, council formally opposes the southern route. A station described as probable, three years ahead of the federal decision on whether the project proceeds at all.
    Status Signalled, not committed
    Development along the Highway 401 corridor around the South Frontenac and Kingston region (clause 2) — the express contingency on which support rests. Not addressed. The Toronto–Ottawa segment is third in ALTO’s publication queue and has not been released for feedback.
    Status Not addressed
    Route and stop as close to the urban core as possible (clause 3). Not addressed. On the currently proposed southern alignment, which passes north of the city, a station would sit some 25 to 30 minutes by road from downtown and outside the existing rail network.
    Status Not addressed
    Service levels. Not addressed in the resolution, though its recitals rest on Kingston’s established rail demand and on a stop enabling meaningful shifts from passenger vehicles. Most trains would pass through without stopping. No daily calling frequency has been stated.
    Status Unstated on both sides

    The resolution was circulated to the Prime Minister, the Minister of Transport, ALTO’s chief executive, area MPs and MPPs, the Mayor of South Frontenac, and the Eastern Ontario Mayors’ and Wardens’ Caucuses. Its conditions are on the record with every party who would need to honour them.

    The Other Half of the Equation

    A new station is a gain only if the service Kingston has survives

    Transport Canada’s 2025–26 estimates record funding to VIA Rail to support the planning and eventual transfer of its Québec City–Windsor corridor passenger services to the private partner. That transfer is stated federal intent, not conjecture. More than 80 per cent of VIA Rail’s revenue and more than 90 per cent of its passengers are in that corridor.

    The consequence for Kingston follows directly from ALTO’s own numbers. The project’s ridership forecast depends substantially on diverting existing corridor rail passengers — travellers who, by definition, stop buying VIA tickets. The economics of the Kingston Subdivision would then rest on intermediate-point traffic alone, having lost the end-to-end market that carries them. Either frequencies fall, or subsidy rises, or both. This is an observation about the project’s arithmetic, not an accusation about anyone’s intentions.

    The commercial logic has already been demonstrated once

    In September 2025, VIA Rail announced a pilot running four daily trains non-stop between Montréal and Toronto, bypassing intermediate Eastern Ontario communities. For Kingston it would have removed 33 weekly stops and the first five morning departures, leaving an 11 a.m. first eastbound train and making same-day travel impractical. Kingston, Belleville and Napanee councils passed motions opposing it. It was postponed on operational constraints with CN — not withdrawn — and VIA stated it would continue pursuing direct Montréal–Toronto service.

    The same reasoning, ten months later, from the other operator

    What ALTO’s chief executive described on 22 July is the same commercial logic, applied to the same city, by operators whose corridor business is slated to converge under the transfer. Kingston’s downside case is not speculative. It was tabled ten months ago, quantified, and shelved rather than abandoned.

    The arithmetic Kingston should be doing is net

    A platform served by a minority of ALTO services, combined with a thinned conventional service on the existing line, can leave the city with fewer useful trains than it has today — while being announced as a gain. No party is presently negotiating the second half of that equation, and Resolution 2026-73 does not address it.

    The View From a Supporter of the Project

    A long-standing advocate for high-speed rail reaches the same conclusions

    On 15 July 2026, Transport Action Canada wrote to the Minister of Transport about the Kingston alignment; the letter was published by the organisation’s Ontario division on 22 July — the same day as the chief executive’s remarks. Transport Action Canada describes a decades-long record of advocating for high-speed rail in this corridor and welcomed the federal commitment to build it. Its letter is not an objection to the project. It is a warning about how this station is being contemplated, and its lead condition is that any ALTO stop in Kingston be co-located with the existing VIA Rail station.

    Access time cancels the time saving

    Transport Action Canada’s position is that any Kingston station must be co-located with, and fully integrated into, the existing VIA Rail network. Sited instead on ALTO’s currently proposed southern alignment — which they put at approximately 25 to 30 minutes by road from downtown Kingston — it would, in their assessment, likely fail to generate the anticipated ridership and modal shift, because the time spent reaching the station negates the journey-time advantage the line exists to deliver.

    The net effect on both operators

    The same letter states that such a station would divert passengers from VIA Rail, reducing ridership on existing services and increasing VIA Rail’s operating subsidy requirements — what the organisation calls a lose-lose scenario for both services. This is the net-frequency problem set out above, reached independently by an organisation that wants the project delivered.

    Existing corridors before new right-of-way

    The letter closes on the alignment question directly: of the two existing rights-of-way between Montréal and Toronto, one remains largely suitable for high-speed operation while the other could accommodate redirected freight if track capacity were restored. Every opportunity to use existing corridors, it argues, should be explored before undertaking the cost and disruption of an entirely new right-of-way. The letter also notes that the economic rationale and business case for the selected project — including the long-promised Joint Project Office report — have still not been published.

    Read alongside Resolution 2026-73, the letter sharpens what Kingston should be asking for. Council’s condition was a station; the more exacting question is which station — one that joins the network the city already uses, or one that starts a second, thinner network beside it.

    The Design Question Underneath

    “We cannot stop in all the communities” is a choice, not a constraint

    Asked about a possible stop at Smiths Falls, ALTO’s chief executive said VIA Rail remains an option for smaller communities, and that the project cannot serve every community if it is to remain fast and economical.

    The first half of that answer describes a two-tier corridor whose lower tier has no identified funder, no committed frequency, and no infrastructure pathway. The communities on that lower tier — Oshawa, Cobourg, Port Hope, Trenton Junction, Belleville, Napanee, Kingston, Gananoque, Brockville, Cornwall, Dorval — have, with one exception, no viable airport. For most, conventional rail is the only intercity connection to healthcare, post-secondary institutions and economic centres.

    The second half is presented as a constraint of physics. It is better understood as a consequence of a design choice. The number of communities a corridor can serve is a function of its design speed: the higher the speed, the more costly each stop becomes in schedule terms, and the fewer stops the business case will tolerate. A 300 km/h line is committed to skipping intermediate cities. A 200 km/h line is not.

    That is the case for High Performance Passenger Rail as an alternative approach — a lower design speed permitting intermediate communities to be served on the fast network itself, rather than skipped and then handed back to a legacy service whose future funding no one has described. It produces a slower headline journey time between Toronto and Montréal, and a materially better network for the roughly one million people living between them.

    Implications for autumn 2026

    What could still be settled before the Toronto–Ottawa route is published

    ALTO has stated that the Montréal–Ottawa alignment goes to public feedback this autumn, with the Toronto–Ottawa segment to follow. Kingston’s window to convert a signalled station into a specified one closes when that segment is published, not when it is built. The outstanding items divide into two categories.

    Within ALTO’s authority to answer now

    Whether the 401 contingency is being met Council’s support rests on development along the Highway 401 corridor around the South Frontenac and Kingston region. Confirming whether the segment under study satisfies that condition is a disclosure, not a study.
    Station location, co-location and access time Where the station would sit, whether it would be co-located with and integrated into the existing VIA Rail station, and the door-to-door journey time from downtown Kingston.
    Daily calling pattern at opening How many services call in each direction, and what commitment exists that the pattern survives timetable optimisation after opening.
    Station capital cost and its treatment The cost of the station and its approach works, and how it is carried in the business case.

    Requires a federal decision

    Conventional service after the corridor transfer What service operates on the existing Kingston Subdivision once corridor operations transfer, at what frequency, funded by whom, and under what protection. This sits with Parliament and the Minister, not with ALTO.
    Net frequency guarantee A commitment that a new station is additive to, not substitutive for, existing service — the demand advanced against the September 2025 express pilot, which applies unchanged to the pattern now described for ALTO.
    Whether the project proceeds at all The development phase runs to 2029, after which ALTO reports to the federal government and the decision to continue is taken. Every commitment discussed above is made in advance of that decision.
    Where things stand · July 2026

    Summary ledger

    Measured against the conditions Kingston City Council itself set:

    Signalled
    A new stop in Kingston. Described as probable by ALTO’s chief executive on 22 July 2026. No decision has been confirmed, and the mayor has said as much.
    Not addressed
    The Highway 401 contingency. Council’s support is expressly conditional on development along the 401 corridor around the South Frontenac and Kingston region. Nothing said on 22 July speaks to alignment.
    Not addressed
    Proximity to the urban core, and co-location. Whether a Kingston station would join the existing VIA Rail station and network, or be built new outside the city on an alignment passing north of it, determines its catchment, its access time and its ridership. The statement does not distinguish them.
    Contradicted
    Service frequency. The ridership justification and the express-running plan point in opposite directions. No daily calling pattern has been stated.
    Not addressed
    Conventional service after the corridor transfer. Frequency, funder and protection all unstated, on a line whose revenue base ALTO’s own forecast is designed to divert.
    Not addressed
    Net useful services. Whether Kingston has more usable daily trains after opening than before, counting both operators, is the only measure that answers the question residents are actually asking.
    Deferred
    The project decision itself. The development phase runs to 2029; the federal government decides afterwards whether to proceed.

    None of these questions presumes the project fails. Each asks only that the analysis behind the statement be disclosed — and, in the case of the 401 contingency, that a condition Kingston placed on its own support be answered before the Toronto–Ottawa alignment is fixed. Until then, what has been announced is an intention, not a service.

    Sources

    Primary documents and statements

    1.
    CBC News, “Kingston probably getting high-speed rail stop, says Alto CEO,” 22 July 2026 — interview with Martin Imbleau, CBC Radio Ottawa Morning. cbc.ca
    2.
    City of Kingston, Council Meeting Minutes 2026-06, 17 February 2026 — Resolution Number 2026-73, “Support for Alto High Speed Rail Southern Route, as Amended,” carried as amended 9–2; amendment votes 8–3 and 10–1; deferral motion lost 3–8; ALTO briefing and delegations recorded. cityofkingston.ca
    3.
    Elliot Ferguson, “Kingston city council supports a southern high-speed rail route,” The Kingston Whig-Standard, 18 February 2026 — contemporaneous report of the council debate and the dissenting councillors’ objections. thewhig.com
    4.
    Christena Lawrie, “Council votes to withdraw support for federal high speed rail project,” CFRC / Local Journalism Initiative, 13 March 2025 — unanimous withdrawal of support, and the regional hub commitment under the earlier High Frequency Rail proposal. cfrc.ca
    5.
    Kingstonist, “South Frontenac says no to high-speed rail line through township,” February 2026. kingstonist.com
    6.
    Transport Canada (2025–26). Supplementary Estimates: High-Speed Rail Initiative — funding to VIA Rail supporting the planning and eventual transfer of Québec City–Windsor corridor services to the private partner. tc.canada.ca
    7.
    Transport Action Canada, “VIA Rail launches Montréal–Toronto express trains but cuts service to lakeshore cities,” September 2025. transportaction.ca
    8.
    CBC News, “Via Montreal–Toronto pilot that skipped eastern Ontario postponed,” 29 September 2025. cbc.ca
    9.
    Kingstonist, “Pilot Pains: VIA Rail insists Kingston will remain among ‘best served’ cities in country,” 31 October 2025 — Belleville and Napanee council motions. kingstonist.com
    11.
    Tariq Khan, President, Transport Action Canada — letter to the Honourable Steven MacKinnon, Minister of Transport, “Re: Alto Kingston Alignment,” 15 July 2026. Published by Transport Action Ontario as “General Support for Alto Kingston Alignment, but Concerns Exist,” 22 July 2026. ontario.transportaction.ca   letter (PDF)