Tag: Transport Action Canada

  • Which trains stop in kingston

    Which Trains Stop in Kingston?

    A probable station, an unpublished route, and the conditions Kingston City Council actually set.

    ⚠ New Statement: ALTO CEO on a Kingston Stop

    On 22 July 2026, ALTO chief executive Martin Imbleau told CBC Radio’s Ottawa Morning that Kingston will probably receive a station, citing demand — It’s doable, the ridership is very strong — because Kingston is a large community. In the same interview he said that most ALTO trains would pass through Kingston without stopping, along with Laval and Trois-Rivières, in order to preserve express service between the larger cities. CBC News

    No alignment has been published for the segment that would carry the station. ALTO has said the Montréal–Ottawa route goes to public feedback this autumn, with the Toronto–Ottawa segment — the one containing Kingston — to follow.

    Critical Finding

    The two statements cannot both carry the weight assigned to them. If Kingston’s demand justifies building a station, it justifies serving it; if the timetable cannot absorb the stop, something other than the ridership case is driving the decision. But the more consequential question is not whether Kingston receives a platform. It is how many useful trains Kingston has the day the line opens, counting both operators — and on that question the announcement is silent.

    Kingston City Council’s support is not unconditional and never was. Resolution 2026-73, adopted 17 February 2026 by a vote of 9–2, makes support for a southern route contingent upon development along the Highway 401 corridor around the South Frontenac and Kingston region and on a new stop being added in Kingston. It further asks that the route and stop sit as close to the urban core as possible, and resolves that if there is no station in Kingston, council formally opposes the southern route. Of these, the 22 July statement addresses one, provisionally. The 401 contingency and the urban-core request are not addressed at all.

    Meanwhile the service Kingston already has is exposed from the other direction. Transport Canada’s 2025–26 estimates record funding to support the planning and eventual transfer of VIA Rail’s Québec City–Windsor corridor operations to the private partner. More than 80 per cent of VIA Rail’s revenue comes from that corridor. A station served by a minority of ALTO trains, combined with a thinned conventional service on the existing line, can leave Kingston with fewer useful daily trains than it has today.

    The Arithmetic

    What an intermediate stop costs at 300 km/h

    A station call on a high-speed line is expensive in a way that is easy to underestimate. The train must decelerate from line speed, dwell at the platform, and accelerate back to line speed. On comparable systems the round-trip cost of a single intermediate stop is on the order of four to six minutes, before any allowance for the slower alignment geometry often required to reach a city-centre location.

    That penalty falls on every through passenger, on every train that stops. Because the project’s commercial proposition is journey time between the anchor cities, the timetable resolves the conflict in the predictable direction: the stop is retained, and most services are routed past it. This is what the chief executive described on 22 July, and it is a rational operating decision given the design speed.

    What it does not resolve is the capital exposure. The station, its platforms and approach works, and whatever alignment concession is required to bring the corridor within reach of Kingston are paid for in full, irrespective of how many trains call. A station served by a minority of services carries close to the full cost of one served by all of them while delivering a fraction of the utility. The frequency a passenger actually experiences — not the presence of a platform — determines whether a station changes travel behaviour.

    This is not an argument that Kingston should be excluded. It is an argument that a stop and a useful service are different commitments, and that only the first has been signalled.

    The Municipal Record

    What Kingston City Council actually resolved

    9–2
    council vote adopting Resolution 2026-73, as amended
    17 February 2026, meeting 2026-06
    33
    weekly Kingston stops the deferred VIA express pilot would have removed
    September 2025 proposal
    2029
    end of the development phase, after which the federal government decides whether to proceed
    ALTO briefing to council, February 2026

    In March 2025, on a motion from the mayor, Kingston City Council voted unanimously to withdraw its support for ALTO. The stated grievance was the change from VIA Rail’s earlier High Frequency Rail proposal, under which Kingston was to have been a regional hub.

    On 17 February 2026, council reversed that position. Senior ALTO representatives briefed council that evening, immediately before the vote. Eight delegations spoke to the motion — among them Queen’s University, Kingston Health Sciences Centre, the Downtown Kingston Business Improvement Area, Kingston Accommodation Partners and the Corridor Train Alliance; the minutes record none opposed. A motion to defer consideration to the March meeting was lost 3–8. Resolution 2026-73 then carried as amended, 9–2, with Councillors Glenn and McLaren opposed.

    The adopted text is more specific than the public discussion of it has generally been. Its four operative clauses:

    Clause 1 — the request

    Calls on the federal Minister of Transport to enhance ALTO’s mandate to include the addition of a Kingston stop on the proposed ALTO High-Speed Rail Southern Route between Peterborough and Ottawa.

    Clause 2 — the contingency

    Expresses support for a southern route contingent upon development along the Highway 401 corridor around the South Frontenac and Kingston region, and provided there is a new stop added that is in Kingston.

    Clause 3 — the location request

    Requests that the southern route and planned stop be located as close to the urban core of the city as possible.

    Clause 4 — the trigger

    Resolves that if there is no station in Kingston, council formally opposes the creation of the ALTO southern route as one that would bypass Kingston and offer no benefit to the city or Eastern Ontario.

    Clauses 1 and 2 do not describe the same corridor. The first asks the Minister to add a stop to the proposed southern route — the alignment already on the table, which despite its name still passes north of the city, and on which a station would sit roughly 25 to 30 minutes by road from downtown Kingston. The second makes support conditional on a Highway 401 alignment. The 401 contingency entered by amendment (carried 8–3); a second amendment (10–1) softened clause 2’s endorsement of the existing route, and left clause 1 as drafted.

    The word “southern” has caused some confusion locally. It describes a route that is southern relative to the Havelock alignment through Peterborough — not one that approaches the lakeshore or the existing rail corridor through Kingston. The practical question for the city is therefore not downtown versus not-downtown. It is whether a Kingston station would be co-located with the existing VIA Rail station, inside the city and inside the existing network, or built new on the far side of it.

    That is the inconsistency the two dissenting councillors identified on the night. Their objection was that language open to interpretation would be interpreted by others, and that Kingston risked breaking faith with South Frontenac Township — whose own council had days earlier opposed the line through the township and backed a route through Kingston instead.

    “The details do still matter.”Councillor Conny Glenn, on the February motion — reported in The Kingston Whig-Standard, 18 February 2026

    Five months later, ALTO can satisfy clause 1 without satisfying clause 2. A probable stop on the existing proposed southern alignment answers the request while leaving the contingency untouched — and nothing said on 22 July distinguishes between them.

    What Resolution 2026-73 conditions support onWhat the 22 July statement provides
    A new stop in Kingston (clauses 1, 2 and 4). Absent one, council formally opposes the southern route. A station described as probable, three years ahead of the federal decision on whether the project proceeds at all.
    Status Signalled, not committed
    Development along the Highway 401 corridor around the South Frontenac and Kingston region (clause 2) — the express contingency on which support rests. Not addressed. The Toronto–Ottawa segment is third in ALTO’s publication queue and has not been released for feedback.
    Status Not addressed
    Route and stop as close to the urban core as possible (clause 3). Not addressed. On the currently proposed southern alignment, which passes north of the city, a station would sit some 25 to 30 minutes by road from downtown and outside the existing rail network.
    Status Not addressed
    Service levels. Not addressed in the resolution, though its recitals rest on Kingston’s established rail demand and on a stop enabling meaningful shifts from passenger vehicles. Most trains would pass through without stopping. No daily calling frequency has been stated.
    Status Unstated on both sides

    The resolution was circulated to the Prime Minister, the Minister of Transport, ALTO’s chief executive, area MPs and MPPs, the Mayor of South Frontenac, and the Eastern Ontario Mayors’ and Wardens’ Caucuses. Its conditions are on the record with every party who would need to honour them.

    The Other Half of the Equation

    A new station is a gain only if the service Kingston has survives

    Transport Canada’s 2025–26 estimates record funding to VIA Rail to support the planning and eventual transfer of its Québec City–Windsor corridor passenger services to the private partner. That transfer is stated federal intent, not conjecture. More than 80 per cent of VIA Rail’s revenue and more than 90 per cent of its passengers are in that corridor.

    The consequence for Kingston follows directly from ALTO’s own numbers. The project’s ridership forecast depends substantially on diverting existing corridor rail passengers — travellers who, by definition, stop buying VIA tickets. The economics of the Kingston Subdivision would then rest on intermediate-point traffic alone, having lost the end-to-end market that carries them. Either frequencies fall, or subsidy rises, or both. This is an observation about the project’s arithmetic, not an accusation about anyone’s intentions.

    The commercial logic has already been demonstrated once

    In September 2025, VIA Rail announced a pilot running four daily trains non-stop between Montréal and Toronto, bypassing intermediate Eastern Ontario communities. For Kingston it would have removed 33 weekly stops and the first five morning departures, leaving an 11 a.m. first eastbound train and making same-day travel impractical. Kingston, Belleville and Napanee councils passed motions opposing it. It was postponed on operational constraints with CN — not withdrawn — and VIA stated it would continue pursuing direct Montréal–Toronto service.

    The same reasoning, ten months later, from the other operator

    What ALTO’s chief executive described on 22 July is the same commercial logic, applied to the same city, by operators whose corridor business is slated to converge under the transfer. Kingston’s downside case is not speculative. It was tabled ten months ago, quantified, and shelved rather than abandoned.

    The arithmetic Kingston should be doing is net

    A platform served by a minority of ALTO services, combined with a thinned conventional service on the existing line, can leave the city with fewer useful trains than it has today — while being announced as a gain. No party is presently negotiating the second half of that equation, and Resolution 2026-73 does not address it.

    The View From a Supporter of the Project

    A long-standing advocate for high-speed rail reaches the same conclusions

    On 15 July 2026, Transport Action Canada wrote to the Minister of Transport about the Kingston alignment; the letter was published by the organisation’s Ontario division on 22 July — the same day as the chief executive’s remarks. Transport Action Canada describes a decades-long record of advocating for high-speed rail in this corridor and welcomed the federal commitment to build it. Its letter is not an objection to the project. It is a warning about how this station is being contemplated, and its lead condition is that any ALTO stop in Kingston be co-located with the existing VIA Rail station.

    Access time cancels the time saving

    Transport Action Canada’s position is that any Kingston station must be co-located with, and fully integrated into, the existing VIA Rail network. Sited instead on ALTO’s currently proposed southern alignment — which they put at approximately 25 to 30 minutes by road from downtown Kingston — it would, in their assessment, likely fail to generate the anticipated ridership and modal shift, because the time spent reaching the station negates the journey-time advantage the line exists to deliver.

    The net effect on both operators

    The same letter states that such a station would divert passengers from VIA Rail, reducing ridership on existing services and increasing VIA Rail’s operating subsidy requirements — what the organisation calls a lose-lose scenario for both services. This is the net-frequency problem set out above, reached independently by an organisation that wants the project delivered.

    Existing corridors before new right-of-way

    The letter closes on the alignment question directly: of the two existing rights-of-way between Montréal and Toronto, one remains largely suitable for high-speed operation while the other could accommodate redirected freight if track capacity were restored. Every opportunity to use existing corridors, it argues, should be explored before undertaking the cost and disruption of an entirely new right-of-way. The letter also notes that the economic rationale and business case for the selected project — including the long-promised Joint Project Office report — have still not been published.

    Read alongside Resolution 2026-73, the letter sharpens what Kingston should be asking for. Council’s condition was a station; the more exacting question is which station — one that joins the network the city already uses, or one that starts a second, thinner network beside it.

    The Design Question Underneath

    “We cannot stop in all the communities” is a choice, not a constraint

    Asked about a possible stop at Smiths Falls, ALTO’s chief executive said VIA Rail remains an option for smaller communities, and that the project cannot serve every community if it is to remain fast and economical.

    The first half of that answer describes a two-tier corridor whose lower tier has no identified funder, no committed frequency, and no infrastructure pathway. The communities on that lower tier — Oshawa, Cobourg, Port Hope, Trenton Junction, Belleville, Napanee, Kingston, Gananoque, Brockville, Cornwall, Dorval — have, with one exception, no viable airport. For most, conventional rail is the only intercity connection to healthcare, post-secondary institutions and economic centres.

    The second half is presented as a constraint of physics. It is better understood as a consequence of a design choice. The number of communities a corridor can serve is a function of its design speed: the higher the speed, the more costly each stop becomes in schedule terms, and the fewer stops the business case will tolerate. A 300 km/h line is committed to skipping intermediate cities. A 200 km/h line is not.

    That is the case for High Performance Passenger Rail as an alternative approach — a lower design speed permitting intermediate communities to be served on the fast network itself, rather than skipped and then handed back to a legacy service whose future funding no one has described. It produces a slower headline journey time between Toronto and Montréal, and a materially better network for the roughly one million people living between them.

    Implications for autumn 2026

    What could still be settled before the Toronto–Ottawa route is published

    ALTO has stated that the Montréal–Ottawa alignment goes to public feedback this autumn, with the Toronto–Ottawa segment to follow. Kingston’s window to convert a signalled station into a specified one closes when that segment is published, not when it is built. The outstanding items divide into two categories.

    Within ALTO’s authority to answer now

    Whether the 401 contingency is being met Council’s support rests on development along the Highway 401 corridor around the South Frontenac and Kingston region. Confirming whether the segment under study satisfies that condition is a disclosure, not a study.
    Station location, co-location and access time Where the station would sit, whether it would be co-located with and integrated into the existing VIA Rail station, and the door-to-door journey time from downtown Kingston.
    Daily calling pattern at opening How many services call in each direction, and what commitment exists that the pattern survives timetable optimisation after opening.
    Station capital cost and its treatment The cost of the station and its approach works, and how it is carried in the business case.

    Requires a federal decision

    Conventional service after the corridor transfer What service operates on the existing Kingston Subdivision once corridor operations transfer, at what frequency, funded by whom, and under what protection. This sits with Parliament and the Minister, not with ALTO.
    Net frequency guarantee A commitment that a new station is additive to, not substitutive for, existing service — the demand advanced against the September 2025 express pilot, which applies unchanged to the pattern now described for ALTO.
    Whether the project proceeds at all The development phase runs to 2029, after which ALTO reports to the federal government and the decision to continue is taken. Every commitment discussed above is made in advance of that decision.
    Where things stand · July 2026

    Summary ledger

    Measured against the conditions Kingston City Council itself set:

    Signalled
    A new stop in Kingston. Described as probable by ALTO’s chief executive on 22 July 2026. No decision has been confirmed, and the mayor has said as much.
    Not addressed
    The Highway 401 contingency. Council’s support is expressly conditional on development along the 401 corridor around the South Frontenac and Kingston region. Nothing said on 22 July speaks to alignment.
    Not addressed
    Proximity to the urban core, and co-location. Whether a Kingston station would join the existing VIA Rail station and network, or be built new outside the city on an alignment passing north of it, determines its catchment, its access time and its ridership. The statement does not distinguish them.
    Contradicted
    Service frequency. The ridership justification and the express-running plan point in opposite directions. No daily calling pattern has been stated.
    Not addressed
    Conventional service after the corridor transfer. Frequency, funder and protection all unstated, on a line whose revenue base ALTO’s own forecast is designed to divert.
    Not addressed
    Net useful services. Whether Kingston has more usable daily trains after opening than before, counting both operators, is the only measure that answers the question residents are actually asking.
    Deferred
    The project decision itself. The development phase runs to 2029; the federal government decides afterwards whether to proceed.

    None of these questions presumes the project fails. Each asks only that the analysis behind the statement be disclosed — and, in the case of the 401 contingency, that a condition Kingston placed on its own support be answered before the Toronto–Ottawa alignment is fixed. Until then, what has been announced is an intention, not a service.

    Sources

    Primary documents and statements

    1.
    CBC News, “Kingston probably getting high-speed rail stop, says Alto CEO,” 22 July 2026 — interview with Martin Imbleau, CBC Radio Ottawa Morning. cbc.ca
    2.
    City of Kingston, Council Meeting Minutes 2026-06, 17 February 2026 — Resolution Number 2026-73, “Support for Alto High Speed Rail Southern Route, as Amended,” carried as amended 9–2; amendment votes 8–3 and 10–1; deferral motion lost 3–8; ALTO briefing and delegations recorded. cityofkingston.ca
    3.
    Elliot Ferguson, “Kingston city council supports a southern high-speed rail route,” The Kingston Whig-Standard, 18 February 2026 — contemporaneous report of the council debate and the dissenting councillors’ objections. thewhig.com
    4.
    Christena Lawrie, “Council votes to withdraw support for federal high speed rail project,” CFRC / Local Journalism Initiative, 13 March 2025 — unanimous withdrawal of support, and the regional hub commitment under the earlier High Frequency Rail proposal. cfrc.ca
    5.
    Kingstonist, “South Frontenac says no to high-speed rail line through township,” February 2026. kingstonist.com
    6.
    Transport Canada (2025–26). Supplementary Estimates: High-Speed Rail Initiative — funding to VIA Rail supporting the planning and eventual transfer of Québec City–Windsor corridor services to the private partner. tc.canada.ca
    7.
    Transport Action Canada, “VIA Rail launches Montréal–Toronto express trains but cuts service to lakeshore cities,” September 2025. transportaction.ca
    8.
    CBC News, “Via Montreal–Toronto pilot that skipped eastern Ontario postponed,” 29 September 2025. cbc.ca
    9.
    Kingstonist, “Pilot Pains: VIA Rail insists Kingston will remain among ‘best served’ cities in country,” 31 October 2025 — Belleville and Napanee council motions. kingstonist.com
    11.
    Tariq Khan, President, Transport Action Canada — letter to the Honourable Steven MacKinnon, Minister of Transport, “Re: Alto Kingston Alignment,” 15 July 2026. Published by Transport Action Ontario as “General Support for Alto Kingston Alignment, but Concerns Exist,” 22 July 2026. ontario.transportaction.ca   letter (PDF)
  • Transport Action Canada

    The Voice ALTO Has Already Heard From

    Transport Action Canada and Transport Action Ontario — the country’s principal pro-rail civil-society voice — have made detailed substantive recommendations about ALTO. What they asked for. What the record shows ALTO has so far addressed. What their voice contributes that nothing else in the public record does.

    ⚠ Documents Under Analysis

    On March 16, 2026, Transport Action Canada and Transport Action Ontario submitted an 18-recommendation written response to ALTO at the close of the January–March 2026 consultation period. The organizations also published an open letter setting out what they believe the substantive questions about the project are, and what credible alternatives have been studied previously.

    They are explicitly pro-rail. They are not opposed to high-speed rail in principle. Their concerns are technical, financial, and service-continuity concerns, and they are asking for the same documents and analyses that Parliament’s own Transport Committee asked for in September 2024 — and that have not been produced.

    Critical Finding

    The questions about ALTO’s cost, ridership, document release, and VIA-service impact are not coming only from project-affected landowners, from anti-rail critics, or from research initiatives. They are coming from the country’s principal pro-rail civil-society voice, in March 2026, on the public record, having formally engaged with ALTO through ALTO’s own consultation process.

    The brief sets out what Transport Action asked for, what the record shows ALTO has addressed, and what credible alternatives they have publicly identified.

    Download
    The Voice ALTO Has Already Heard From — Full Brief (PDF)
    What Transport Action Canada and Transport Action Ontario asked of ALTO, what ALTO has addressed, and what their voice contributes to the public record
    Download PDF
    The Witness

    Who Transport Action is

    Transport Action Canada describes itself as “Canada’s citizen advocacy organization for public transportation,” with members who have “discussed and debated the subject over the past five decades, including of course High Speed Rail and possible alternatives.” It and its provincial affiliates — including Transport Action Ontario, jointly authoring the consultation letter analysed here — are the principal national civil-society voice on Canadian intercity rail policy.

    Their position on ALTO is unambiguous. The open letter opens by welcoming “serious discussion of all options to improve passenger rail.” The consultation letter opens by describing the organizations as “a knowledgeable, passenger-focussed NGO that is very supportive of intercity passenger rail.” They explicitly recognize the underlying problem ALTO is intended to address — that VIA Rail’s constrained access to CN’s Kingston Subdivision “has long been recognized as untenable, which prompted the development and launch of VIA’s High Frequency Rail proposal in 2015.”

    They acknowledge the limits of incremental improvement: “just improving the CN route in isolation while continuing to operate alongside freight would not come close to the quintupling of capacity and slashing of travel times possible with some kind of dedicated track.” They are, in plain terms, an organization that wants more passenger rail in Canada and is substantively critical of how this particular HSR project is being delivered.

    What They Asked For

    The March 2026 consultation response

    Transport Action’s March 16, 2026 letter to ALTO’s Government and Stakeholder Relations office contains eighteen specific recommendations across seven sections. The four recommendations that most directly overlap with the existing CRI evidence base are set out below.

    Recommendation 1
    On the business case and cost
    What Transport Action asked

    “There is considerable skepticism from the public and stakeholders about the business case for HSR… It is urgent that a detailed Business Case be completed as soon as possible, including preferred corridor, capital cost, detailed ridership, fares, revenue and methods of calculation.”

    Mapped onto the parliamentary record

    This is, in substance, the same request as Recommendation 4 of TRAN Report 18 (September 2024), which asked the Minister to require an HFR-versus-HSR cost analysis within six months. As CRI’s brief The Report That Vanished documents, that analysis was never produced. Transport Action is asking, eighteen months later, for the same kind of cost-and-business-case work.

    Recommendation 2
    On ridership transparency
    What Transport Action asked

    “No details are provided on the ridership model, population assumptions, network assumptions, demand per segment, fares, cost of gasoline etc. Although the ridership assumption may be reasonable when lifted from European ridership, there is skepticism that this would be replicated in central Canada, due to lower fuel prices, absence of road tolls etc.”

    Mapped onto the parliamentary record

    This maps directly onto Claim 3 in Reading the Answer — the government’s 43-million-by-2084 ridership figure in Q-923. Transport Action specifically raises the central-Canadian fuel-price and road-toll conditions that distinguish the corridor from the European benchmarks, and quantifies the Ontario provincial subsidy to personal car use at $2.5 billion per year as a “politically tilted playing field” that any credible ridership model must account for.

    Recommendation 3
    On document release
    What Transport Action asked

    “We urge you to release a full unredacted version of the JPO report, plus any other reports that were in the ‘data room’ made available to the three bidders. At this time, with the tender process completed, there should be nothing in these reports that is business-confidential.”

    Mapped onto the parliamentary record

    This is — almost word for word — the same request as Recommendation 6 of TRAN Report 18. Transport Action makes an additional point that the procurement-completion rationale for non-disclosure no longer applies: with the bidder data-room phase concluded, there is no remaining commercial confidentiality argument. The reports have still not been released.

    Recommendation 6
    On the future of VIA service
    What Transport Action asked

    “Recent media reports from Kingston regarding possible diminution of current VIA Rail services when ALTO is operational must be heeded… It is important that ALTO and VIA Rail jointly issue a statement promptly about plans for services at these cities. Otherwise, local elected officials and residents will continue to impede ALTO’s progress.

    Mapped onto the parliamentary record

    This maps directly onto Recommendations 8 and 10 of TRAN Report 18 — the VIA-impact analysis and the no-service-reduction commitment, both unanswered since September 2024. The Senate TRCM raised the same concern in February 2026. The question has now been asked across two parliamentary chambers and one substantial stakeholder consultation submission; it has not been substantively answered.

    Transport Action’s remaining fourteen recommendations cover downtown and shoulder station design, affordable fares, intercommunity bus access for towns currently outside the rail network, emergency-management cooperation with rural fire and EMS, wildlife crossings, sufficient road and trail bridges, recognition of Ontario’s 1834 Drainage Act, First Nations contingency planning for archaeological discovery, sensitive-agricultural-use mapping (sugar bushes, vineyards, certified organic land), and compensation frameworks for intensive agricultural operations that would need to be relocated. Several bear directly on issues documented in CRI’s Five Hundred Farms brief.

    Three Alternatives They Identified

    What pro-rail technical analysis says is possible

    A question CRI has not previously had answered by a technically literate pro-rail body: were credible alternatives to ALTO actually studied, and what did the studies show? Transport Action’s open letter identifies three.

    01

    Targeted CN-route improvements

    “Further investments to improve passenger and freight fluidity, like the third track between Belleville and Napanee and station improvements… would make a big difference to reliability at modest cost.”

    Transport Action concedes this alone is insufficient to deliver the “quintupling of capacity and slashing of travel times” possible with a dedicated track — but lays out a complementary package of known modest cost.

    02

    The freight grand bargain

    “Moves most CN freight over to the CPKC route through Perth… The existing CN route could then be upgraded to support more passenger services at up to 170 km/h, with travel times of around 4 hours between Toronto and Montreal or Ottawa.”

    This is the High Performance Rail framework substantially as CRI has documented it, here independently advocated by Transport Action as a technically credible option.

    03

    HFR on the original Havelock alignment

    “A dedicated track that takes a more direct route between Toronto and Ottawa, with the advantage of reconnecting Peterborough to the railway network, was VIA Rail’s preferred option, while also preserving service on the existing route through Kingston.”

    This is the project the Joint Project Office was funded in 2017 to study, the project the Transport Committee studied in 2023–24, and the project the federal government redesignated in late 2024.

    Why earlier HSR-along-the-lakeshore studies did not proceed

    Of independent technical interest is Transport Action’s observation about why HSR following the Lake Ontario lakeshore has been studied multiple times without proceeding:

    High Speed Rail following a lakeshore from Toronto through Kingston has also been studied before, more than once, by both the federal and provincial governments, without proceeding. For safety reasons, and to achieve 7 km+ minimum radii for higher speeds, such a dedicated track could not be placed too close to the existing alignment nor right alongside Highway 401. It would thus require significant expropriation, and the number of homes and businesses close to CN’s tracks and the 401 has only grown since the last such study in 2011. The chances are that communities like Port Hope and Trenton would be bypassed entirely, and route from Kingston to Ottawa would also then also go through the same sensitive Frontenac Arch region and many of the communities expressing most concern about Alto’s southern study corridor.

    Transport Action Canada, open letter on ALTO HSR route options in eastern Ontario. read the letter

    This is the route-geometry argument set out by a pro-rail body with the technical standing to make it — the same observation about HSR’s 7-km curve-radius requirement that CRI’s engineering research has documented, here presented as a published critique by an established advocacy organization.

    What Their Voice Contributes

    A fifth source category, otherwise absent

    The Citizen Research Initiative’s briefs to date have drawn on four categories of source. Each has its own evidentiary weight; each has its own limitations. Transport Action contributes a fifth that has been substantively absent until now.

    Parliamentary record

    Order Paper questions, Transport Committee reports, Senate committee testimony, the High-Speed Rail Network Act. Authoritative but procedurally bounded.

    Academic studies

    The McGill Transportation Research and Munk School Global Economic Policy Lab analyses. Methodologically rigorous but bounded by funding and study scope.

    Journalism

    The Canadian Press and Globe and Mail reporting; CBC News; Globe coverage of the NFU response. Documentary but episodic.

    Affected stakeholders

    OFA, UPA, CFA, BFO, NFU. Authentic to affected communities but advocating for their members’ specific interests.

    Pro-rail advocacy

    Transport Action Canada and Transport Action Ontario. A credible, technically literate, pro-rail civil-society voice with no opposition to the project in principle, no economic interest in its outcome, and a fifty-year record of engagement with Canadian intercity passenger rail policy.

    This matters in two specific ways. First, it forecloses the response that the questions about ALTO’s cost, ridership, document release, and VIA-service impact are coming only from project-affected landowners or from anti-rail critics. They are coming from the country’s principal pro-rail civil-society voice, on the public record, having formally engaged with ALTO through ALTO’s own consultation process. Second, it puts the alternatives that have been considered — including the HPR framework the Initiative has been documenting — into the technical vocabulary of an organization that has the standing to describe them.

    Recommendations That Remain Live

    What still has not been produced

    As of May 2026, the public record shows that:

    The cost analysis Transport Action’s March 2026 letter asked for — and that TRAN Report 18 Recommendation 4 had asked for in September 2024 — has not been produced. The $60–90 billion AACE Class 5 figure in Q-923 stands without it.
    The Joint Project Office report Transport Action’s March 2026 letter asked to be released — and that TRAN Report 18 Recommendation 6 had asked to be released in September 2024 — has not been released. Transport Action’s additional point that the procurement-completion rationale for non-disclosure no longer applies has not been addressed.
    The VIA-impact analysis Transport Action’s March 2026 letter asked for, that the Senate TRCM raised concerns about in February 2026, and that TRAN Report 18 Recommendations 8 and 10 had asked for in September 2024, has not been produced. ALTO’s published material continues to refer to “optimization” of existing VIA services without a binding commitment.
    The ridership-model assumptions Transport Action’s March 2026 letter asked be made public have not been published. The government’s 43-million-by-2084 figure in Q-923 stands without disclosed methodology behind it.

    None of these are partisan demands. None of them is hostile to the project. All of them are recommendations from an established pro-rail advocacy organization, made through ALTO’s own consultation process, asking the same things that Parliament’s own committee was asking. Their continued non-fulfilment is procedural, not substantive — and procedurally, as The Report That Vanished sets out in detail, the questions remain available to be revived by parliamentary or stakeholder action.

    Download Full Brief
    The Voice ALTO Has Already Heard From (PDF)
    Reference document for federal decision-makers, parliamentarians, journalists, and constituents tracking the file
    Download PDF
    Sources

    Primary documents and references

    1.
    Transport Action Canada and Transport Action Ontario, Comments arising from ALTO HSR Stakeholder Roundtable and Public Consultation Sessions (letter to Peter Paz, Government and Stakeholder Relations, ALTO), March 16, 2026. Signed by Terry Johnson (President, Transport Action Canada) and Peter Miasek (President, Transport Action Ontario). ontario.transportaction.ca
    2.
    Transport Action Canada, Why did the government chose Alto? (open letter on ALTO HSR route options in eastern Ontario), 2026. ontario.transportaction.ca
    3.
    House of Commons Standing Committee on Transport, Infrastructure and Communities, Issues and Opportunities: High Frequency Rail in the Toronto to Quebec City Corridor. 18th Report, 44th Parliament, 1st Session. Tabled September 2024. ourcommons.ca
    4.
    Order Paper Question Q-923, 45th Parliament, 1st session. Asked by Philip Lawrence (MP for Northumberland–Clarke), March 5, 2026; answered April 22, 2026.
    5.
    ALTO HSR Citizen Research Initiative companion briefs: Reading the Answer (May 2026); Reading the Footnote (May 2026); The Report That Vanished (May 2026); What We Know About ALTO’s Reporting and Accountability (May 2026); Five Hundred Farms (May 2026).