Nanos research analysis July 2

Polling note · ALTO HSR Citizen Research Initiative

Public priority for ALTO: split nationally, divided by geography

A June 2026 Nanos survey for CTV News finds Canadians evenly divided on whether building the Toronto–Québec City high-speed line should be a federal priority — with real support confined to the corridor it would serve, and firm resistance in the West.

Nanos Research asked 1,051 Canadians, between June 26 and 28, 2026, to rate on a 0-to-10 scale how much of a priority it is for the Government of Canada to build the ALTO high-speed rail project. The question told respondents the line would be Canada’s first high-speed railway and that the estimated cost is between $60 and $90 billion, drawing on both public and private investment. The margin of error is ±3.0 percentage points, 19 times out of 20.

How much of a priority is building ALTO? Public priority for the Toronto–Québec City high-speed rail line, on a 0–10 scale A. National distribution, all 0–10 responses 0% 5% 10% 15% 20% 25% 22.9 0 3.8 1 5.7 2 5.3 3 4.1 4 8.2 5 7.6 6 13.2 7 7.9 8 6 9 11.3 10 “Not at all” “Very high” ◂ Low priority (0–3): 38% Neutral (4–6): 20% High priority (7–10): 38% ▸ Twice as many place it at 0 (23%) as at 10 (11%); median 5, mean 4.8. Balanced bands, but the intensity sits at the bottom. B. Regional lean — low vs. high priority (neutral and unsure omitted) lower ← priority → higher Quebec 33% 48% ▲ mean 5.4 Ontario 35% 43% mean 5.2 Atlantic 33% 38% mean 4.8 Canada 38% 38% mean 4.8 (national) British Columbia 41% 31% mean 4.1 Prairies 50% ▲ 21% ▼ mean 3.4 ▲ / ▼ significantly above / below the national result. Corridor provinces lean positive; the West leans negative. Source: Nanos Research for CTV News (“Power Play”), n=1,051 Canadians, June 26–28, 2026; margin of error ±3.0 pp, 19/20. Full report and data tables: nanos.co. Chart: ALTO HSR Citizen Research Initiative · citizenresearch.ca

A national tie — with the intensity at the bottom

On the collapsed scale the country divides almost exactly in half: 38% rate building ALTO a high priority (7–10) and 38% a low priority (0–3), with 20% neutral and 4% unsure. The mean is 4.8, just below the scale’s midpoint. But the full distribution is not symmetric. The single most common answer is “0 — not at all a priority,” chosen by 23% — roughly twice the 11% who pick “10 — very high priority.” The high side is more spread across 7 through 10; the low side is anchored at the floor. Where the poll registers deprioritization, it tends to be firm.

Support concentrated in the corridor

Priority tracks geography closely. In Quebec, 48% call it a high priority — significantly above the national figure — and Ontario is similar at 43%; both corridor provinces sit above the midpoint on the mean. Outside the corridor the pattern reverses: in the Prairies a majority (50%) rate it a low priority and only 21% a high one, the sole region where “not a priority” is an outright majority; British Columbia leans the same way (41% low, 31% high). Atlantic Canada sits close to the national average. Statistically, the defensible reading is that the corridor provinces lean positive and the West leans negative — individual provinces within each bloc are not clearly distinguishable from one another.

Other differences

Men are more favourable than women (mean 5.0 versus 4.6; 42% high priority versus 35%), a gap that holds up under direct testing. Age, by contrast, is essentially flat — younger and older Canadians rate the project about the same.

How to read it

Two cautions. First, the question measures priority, not approval: it asks where ALTO ranks against everything else the federal government could spend on, so a respondent can favour high-speed rail in principle and still place it low against competing demands. Second, the question anchored respondents to the project’s own cost estimate of $60–90 billion; survey responses are sensitive to the figures a question supplies, and this is the lower end of the plausible range. Regional subgroups also carry wider margins of error (roughly ±5 to ±10 points) than the national result, so fine distinctions within a region should be read with care.

Data source. Nanos Research for CTV News, “Power Play” June omnibus. RDD dual-frame hybrid telephone and online survey of 1,051 Canadians aged 18+, June 26–28, 2026; margin of error ±3.0 percentage points, 19/20; weighted by age and gender (2021 Census) and geographically stratified.
 •  Full report (PDF): https://nanos.co/wp-content/uploads/2026/07/2026-3086-CTV-June-PowerPlay-Report.pdf
 •  Detailed data tables (Excel): https://nanosresearch.sharepoint.com/:x:/s/NanosSharedProjects/IQBHe5k3wYL4RaW7ViFAsbIiATFRJyps7gut2JBtXmC1lvY?e=EVZ84C
 •  Methodology & more polling: nanos.co
Figures in this note and chart are drawn from the published data tables for question 2026-3086; the 0–10 distribution, subgroup breakdowns, and significance testing are as released.
ALTO HSR Citizen Research Initiative  ·  Independent & non-partisan  ·  citizenresearch.ca  ·  This note summarizes third-party polling; it is descriptive and does not represent an endorsement or a voting-intention finding.