A case for frequency

Written by

in

,

A Case for Frequency

A former environment minister makes the case for ALTO in the Toronto Star. Read closely, his evidence points to a different train.

⚠ Status of the figures

Published figures on this page are quoted from the named sources and can be checked there. Every other figure is an Initiative calculation from those sources, and is labelled as one. Where ALTO has not published something, we say so rather than guess. We make no claim about why any figure was or was not published.

In short

We share the goal. Steven Guilbeault wants fewer people driving and flying between our cities. So do we.

His own words make a different case. He says the high-speed and high-frequency options offer similar frequency and capacity. If so, the only thing the extra money buys is speed, and the op-ed never shows that the speed is worth its price.

The problems he describes have cheaper fixes. VIA is late because it shares track with freight trains. Its riders left when its service was cut. Neither problem needs a 300 km/h railway to solve.

Full brief · PDF
A Case for Frequency
Response brief, November 2026, with sources
Download
1 · What the extra money buys

Same frequency, same capacity. The difference is speed.

The op-ed tells us cabinet first leaned toward high-frequency rail, then chose high-speed. It also tells us the two offer similar frequencies and capacities. That means the trains-every-half-hour, room-for-everyone benefits were on offer either way. What ALTO adds is speed, and only speed.

How much does that speed cost? ALTO’s own August 2026 report puts high-frequency rail at $45 to $75 billion and high-speed rail at $60 to $90 billion. The high-frequency figure has no source attached. Taking the middle of each range, the speed costs about $15 billion more (our calculation from ALTO’s table).

And the travel times that speed is meant to buy? In the 2023 government memo released under Access to Information, only the slowest case was worked out by computer simulation. The faster times were spreadsheet estimates.

≈ $15B
Extra cost of speed, at the middle of ALTO’s own ranges
Initiative calculation
1 of 3
Speed cases actually simulated in the 2023 journey-time memo
ATI A-2025-00333
90%+
Share of his Montréal–Ottawa trips the author took on today’s VIA
The op-ed

That last figure matters. The author chose the train on today’s conventional service, on the very stretch where ALTO expects its smallest share of travellers. A frequent, dependable train was enough.

2 · Why VIA runs late

Late trains are a track problem, not a speed problem

The op-ed points to VIA’s poor on-time record: about half its trains on time in 2022 to 2024, and as few as 30 per cent in early 2025. Those numbers come from two different reports that measure punctuality in different ways, but they point the same way.

The reason is simple. Most VIA trains run on tracks owned and controlled by freight railways, and in Canada freight gets priority by default. Our brief Canada’s Rail Exceptionalism found Canada is the only G7 country with none of the usual protections for passenger trains. Give passenger trains their own track and the delays go away, at any speed. That is what the HPR alternative does, at design speeds of 177 to 240 km/h.

3 · Where VIA’s riders went

Riders left when the trains did

The op-ed says VIA has lost about half its riders since the early 1980s. The Library of Parliament tells us when, and why. Ridership peaked at about 8 million in 1981. Then the 1989–1990 cutbacks, ordered to reduce costs and subsidies, cost VIA more than 45 per cent of its passengers.

In other words, people stopped taking the train after there were fewer trains to take. That is good news: it means riders come back when service improves. More frequent, more reliable service is exactly what high-frequency rail and HPR set out to provide.

4 · The European comparison

Comparing apples with oranges

The op-ed says the corridor sees about 96 million trips a year, that ALTO expects to win 25 to 40 per cent of travellers, and that this is modest next to Madrid–Barcelona or Paris–Lyon, where trains carry 35 to 65 per cent.

Start with the 96 million. It counts every trip by every mode over every distance, including short drives no train could carry. Our brief Undressing the Addressable Market finds the market a fast train can really compete for is about a quarter of that: some 25 million trips. Counting the drivers, flyers and VIA riders it could actually win gives about 8 to 9 million riders a year.

But the European numbers usually compare trains with planes only. Spain’s competition regulator, for example, reports rail at 56.5 per cent of the train-plus-plane market. Our corridor is a car market: ALTO’s own analysis, as reported by the Go Alto group, puts driving at 91 per cent of Ottawa–Montréal trips. If ALTO’s shares are shares of all travellers, the comparison does not show its forecast is modest. The op-ed does not say which it is.

ForecastRiders a year
ALTO, 205524 million
McGill University survey, 2050 (without / with new trips the line creates)10.5 / 17.5 million
Initiative ridership range, 2055 (low / middle / high)3.7 / 9.2 / 17.2 million
Initiative count of the real market (drivers, flyers and VIA riders it could win)About 8 to 9 million

ALTO’s 24 million is about 40 per cent above the top of our range for 2055 (our calculation). Which forecast holds depends on the fare, and ALTO has not published it.

5 · Consultation and farmland

The big decisions came first

The op-ed says the consultation matters because the decision has not yet been made. That is true of the exact route. It is not true of the decisions that matter most to people in the corridor.

Feb 2025
High-speed chosen over high-frequency, with the stations named.
Mar 2026
The High-Speed Rail Network Act becomes law. ALTO no longer has to try to buy land before asking to expropriate it.
Apr 2026
Consultation closes, four weeks after the law came into force.
Jun 2026
Farm groups in both provinces ask Ottawa to release the studies behind choosing high-speed rail.

A narrow line can still split a farm

The op-ed says the line itself will be only about 60 metres wide. True, but a 60-metre fenced railway cuts farms in two, closes roads and lengthens every trip between fields. Our brief Counting the Crossings estimates 300 to 600 road closures along the corridor.

The compensation figure of up to 350 per cent of land value comes from unnamed sources quoted by Radio-Canada; ALTO has not published an overall figure. And generous payment answers a different question from the one many farmers are asking, which is whether this land should be taken at all.

6 · The climate case

A long carbon debt, and a small saving

The op-ed’s case is partly about the environment, but it gives no carbon figure, and ALTO has published no lifecycle carbon study of its own. Our November 2026 carbon research fills the gap.

Building ALTO would emit about 14.7 million tonnes of CO₂ (range 6.9 to 29.6 million). The railway pays that back only as passengers leave their cars and planes, and they arrive slowly. On our middle forecast, the debt is not paid off until somewhere between 2083 and 2110, depending on what you count. On our low forecast, it is never paid off.

14.7 Mt
Carbon emitted to build ALTO, middle estimate
Initiative carbon research
2083–2110
When the carbon debt is repaid, middle ridership forecast
Initiative carbon research
0.14–0.20%
ALTO’s 50-year carbon saving, as a share of what electrifying Ontario and Quebec’s road vehicles saves
A CO₂ Rounding Error

Our note ALTO: A CO₂ Rounding Error puts the climate benefit in proportion. Over fifty years ALTO saves, on balance, about 2.5 million tonnes. Switching the cars and light trucks of Ontario and Quebec to electric over the same years saves about 1,097 million tonnes. ALTO’s whole fifty-year saving equals roughly one month of that. Every mode is measured the same way, including the carbon in building cars and batteries.

7 · What the op-ed leaves out

The numbers that would settle it

The op-ed asks readers to keep believing in ALTO. Belief would be easier with these on the table.

Not in the op-ed

The cost$60 to $90 billion, an early-stage estimate.
The value for moneyALTO has declined to publish a benefit-cost ratio. The business case is unreleased.
The fareNo fare is disclosed, though ridership, benefits and cost recovery all depend on it.

Not tested

The alternativeThe op-ed compares ALTO with VIA as it runs today, not with an upgraded or dedicated-track option.
The cost per kilometreAbout $142 million for ALTO against about $54 million for the HPR passenger line, on a like-for-like basis (HPR Research Report, Chapter 3).
The productivity claim86 per cent of ALTO’s GDP estimate rests on one productivity setting. See Two Point Two Trillion.
Conclusion

The right goal, and an untested choice

The op-ed makes a sincere case for passenger rail, and its goal is the right one. Its evidence supports frequent trains on track that freight does not control. Those are gains the author says both options share. The case it does not make is for the extra speed, and the extra cost, measured against an option built to deliver those shared gains. On the numbers set out here, that comparison is still missing from the public record. Our brief The Option Nobody Priced looks at how the existing-corridor option has been assessed.

Full brief · PDF
A Case for Frequency
Eleven sections, with tables and full sources
Download
Sources

Primary documents and statements

1.
Steven Guilbeault, “From activist to federal minister, I’ve hoped for high-speed rail for most of my life,” Toronto Star, 22 November 2026.
2.
ALTO, Canada’s Moment: The Economic Opportunity of High-Speed Rail, August 2026 (Table 2; footnote 32; p. 62).
3.
Transport Canada / VIA HFR, journey-times memorandum and email chain, 2023, released under Access to Information request A-2025-00333.
4.
Library of Parliament, VIA Rail Canada Inc., background paper 2015-55.
5.
CNMC (Spain), rail liberalisation balance 2024, 22 September 2025.
7.
Canadian Press, Farm groups urge review of Alto rail project, 9 June 2026.
8.
Zhang, Negm & El-Geneidy, High-Speed Rail in Canada, Transportation Research at McGill, July 2026.
9.
Aviseo Consulting for Alto, An Overview of the Structural Economic Impacts of Alto, June 2026; CPCS with HDR for Alto, High-Speed Rail and Freight Capacity, June 2026.
10.
ALTO HSR Citizen Research Initiative, carbon research, November 2026: The Carbon Case for ALTO (executive summary); Fifty-Year Lifecycle CO₂ Budget; ALTO: A CO₂ Rounding Error.
11.
ALTO HSR Citizen Research Initiative, demand and ridership: Undressing the Addressable Market; The Ridership Envelope, 2035–2080; Three Claims, One Fare.
12.
ALTO HSR Citizen Research Initiative, other: Estimated, Not Simulated; Canada’s Rail Exceptionalism; Two Point Two Trillion; Counting the Crossings; The Option Nobody Priced; HPR Research Report, Chapter 3.